Skip to content

Phase I ESA 2023-01-20

C-18f20d1141 · Page 1 of 1 · DR-0004 · 2023-01-20

The claim, in the assessor's words

A small de minimis farm debris pile was observed near the Parcel 12 barn; removal is recommended.

Quoted from page 1
A small farm debris pile (de minimis) was observed near the Parcel 12 barn; removal is recommended.

Source field_study · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

Cited by EN-01 Land Use and Site Features, EN-04 Hazardous Materials and Contamination, CU-01 Archaeological Resources, CU-02 Historic Structures and Districts · Filed under EN-01, EN-04

On the page

The page text exactly as the engine read it, with the quote marked.

Placed verbatim · The quote occurs on the page exactly as written.

Read as native

Go to the marked quote

SYNTHETIC TEST FIXTURE - FICTIONAL PROJECT Phase I Environmental Site Assessment (ASTM E1527-21) Brook Hollow Solar Project January 20, 2023 This assessment has revealed no recognized environmental conditions (RECs) in connection with the Property. Quote starts. A small farm debris pile (de minimis) was observed near the Parcel 12 barn; removal is recommended. Quote ends.

The page

The outline marks where the quote begins on the page.

Page 1 of Phase I ESA 2023-01-20

Other claims quoted on this page

  • C-42ffa60059

    The Phase I ESA revealed no recognized environmental conditions (RECs) in connection with the Property.

Lumerian Labs 2026