Skip to content

Land Use and Site Features

EN-01 · Matrix · Environmental Resources

Rating
2Impacts likely but may be easily resolved
Why
Impact likely
Worst case
Not above the rating
Evidence
Reported
Cited claims
6
Requirements
0
Requests
2

Rating

2Impacts likely but may be easily resolved

The rule

Code computed the rating from the assessor's inputs:

impact_likely=yes -> 2

Set by the rule

Decision
Released with flags
The engine's reasons
  • Agencies not in the register or the evidence: Transmission line owner (unidentified)
Evidence state
Reported · desktop, consultant or developer record

Revision

First verdict
weakened
First critique

The core call, a peripheral and avoidable 138 kV line giving category 2, is reasonable. However, the extent rationale uses 1,050 acres where the canonical project figure is 1,356. Impact wording on buildable area loss and the agency list rest on inference. Some next steps are missing.

Revised once after the first critique. Rating unchanged.

The five inputs

  • Present: yes

    Documents describe an existing 138 kV transmission line crossing the eastern Project Area, scattered woodlots, and a de minimis debris pile (C-fe67965fc1, C-71ef7a1eed, C-18f20d1141).

    Cites C-fe67965fc1, C-71ef7a1eed, C-18f20d1141

  • Extent: peripheral

    The line crosses only the eastern portion and is not described as bisecting the site; land cover is predominantly row crops, and parcel 7 shows upland soils with no hydric indicators (C-fe67965fc1, C-f9e7a3aa8c, C-58cb5b6f6c). Easement width and share of area are undocumented. The developer overview cites approximately 1,050 leased acres (C-0ebae50e80) versus the canonical 1,356-acre project figure; the difference is unreconciled but does not change the peripheral judgment, since the line is confined to one portion.

    Cites C-fe67965fc1, C-f9e7a3aa8c, C-58cb5b6f6c, C-0ebae50e80

  • Avoidable: yes

    Professional judgment: a 138 kV line is typically accommodated by setbacks and siting around the corridor, or by a crossing agreement; nothing indicates relocation is needed. Woodlots are scattered and the debris pile is de minimis with removal recommended (C-fe67965fc1, C-71ef7a1eed, C-18f20d1141).

    Cites C-fe67965fc1, C-71ef7a1eed, C-18f20d1141

  • Pathway: standard

    Professional judgment: setbacks and encroachment or crossing consent from the line owner are the usual route; no relocation or easement release is indicated (C-fe67965fc1).

    Cites C-fe67965fc1

  • Impact likely: yes

    Professional judgment: a transmission line crossing part of the site likely requires setbacks and possibly crossing agreements for collection lines or roads, reducing some layout flexibility. Easement width and owner are undocumented (C-fe67965fc1).

    Cites C-fe67965fc1

Comments

Existing 138 kV transmission line crosses the eastern portion of the Project Area. Land cover is predominantly row crops, with scattered woodlots along Sugar Run. Small de minimis farm debris pile near the Parcel 12 barn. No ALTA survey, title commitment or constraints map in the data room.

Critique

Verdict
upheld
Suggested direction for the rating
same
Summary

The assessment is largely supported by the cited quotes and is hedged on easement width and owner. Remaining issues are minor: the parcel 7 attribution, an unsupported County agency, and no step to reconcile the acreage discrepancy. Category 2 is reasonable.

Critic model
Luminol

Issues

  1. Severity minor · Kind unsupported_statement

    Rationale says parcel 7 shows upland soils, but the quoted text of C-58cb5b6f6c does not name parcel 7. The attribution may come from the source page. Wording only.

    Cites C-58cb5b6f6c

  2. Severity minor · Kind missing_next_step

    The 1,050 vs 1,356 acre discrepancy is flagged but no next step reconciles it, for example by confirming leased acreage and the parcel list.

    Cites C-0ebae50e80

  3. Severity minor · Kind other

    County is listed as an agency without a cited basis. The line owner might be Prairie Electric, the POI utility, which is a hypothesis to check rather than a defect.

    Cites C-fe67965fc1

Checks

  • Passed

    rating_has_evidence · blocking

  • Passed

    presence_is_evidenced · not blocking

  • Passed

    counter_evidence_considered · not blocking

  • Passed

    numbers_grounded · not blocking

  • Failed

    agencies_grounded · not blocking

    Agencies not in the register or the evidence: Transmission line owner (unidentified)

  • Passed

    cutoff_respected · blocking

  • Passed

    critic_not_refuted · blocking

Evidence (6)

Each claim the row cites: the statement in the assessor's words, then the quote the engine found on the page.

Brook Hollow Project Overview 2023-03-15

C-0ebae50e80 · Page 1 of 1 · DR-0001

Open the claim, C-0ebae50e80

The project covers approximately 1,050 acres of leased farmland.

Quote check Exact · Placed verbatim · The quote occurs on the page exactly as written. · Read as docx

Brook Hollow Solar Project Overview Date: March 15, 2023 SYNTHETIC TEST FIXTURE - FICTIONAL PROJECT Brook Hollow Solar is a proposed 120 MWac (approximately 160 MWdc) single-axis tracker solar project located in Fixture County, Indiana, Quote starts. on approximately 1,050 acres of leased farmland Quote ends.. The Project will interconnect at the Elm Grove 138 kV substation owned by Prairie Electric, under MISO queue position J1234. Target commercial operation date is December 2025. An existing 138 kV transmission line crosses the eastern portion of the Project Area. Site control consists of option-to-lease agreements with 14 landowners covering 22 parcels. Land cover is predominantly row crops (corn and soybeans) with scattered woodlots along Sugar Run.

This document has no page picture (only PDF and image documents have one).

  1. C-0ebae50e80

    The project covers approximately 1,050 acres of leased farmland.

    Quoted from page 1
    on approximately 1,050 acres of leased farmland

    Brook Hollow Project Overview 2023-03-15 · DR-0001 · Page 1 · 2023-03-15

    Source developer_document · Claim type project_fact · Polarity neutral · Confidence high · Quote check exact, 100 of 100

    Cited by EN-03 · Filed under EN-01, EN-03

  2. C-18f20d1141

    A small de minimis farm debris pile was observed near the Parcel 12 barn; removal is recommended.

    Quoted from page 1
    A small farm debris pile (de minimis) was observed near the Parcel 12 barn; removal is recommended.

    Phase I ESA 2023-01-20 · DR-0004 · Page 1 · 2023-01-20

    Source field_study · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by EN-04, CU-01, CU-02 · Filed under EN-01, EN-04

  3. C-58cb5b6f6c

    Parcel 7 has upland soils and row crops with no hydric indicators.

    Quoted from page 3
    Upland soils, row crops, no hydric indicators.

    Wetland and Stream Delineation Report May2023 · DR-0005 · Page 3 · 2023-05-22

    Source field_study · Claim type presence · Polarity neutral · Confidence medium · Quote check exact, 100 of 100

    Cited by EN-03 · Filed under EN-01, EN-03

  4. C-71ef7a1eed

    Scattered woodlots occur along Sugar Run.

    Quoted from page 1
    scattered woodlots along Sugar Run

    Brook Hollow Project Overview 2023-03-15 · DR-0001 · Page 1 · 2023-03-15

    Source developer_document · Claim type presence · Polarity presence · Confidence medium · Quote check exact, 100 of 100

    Cited by EC-01, EC-02 · Filed under AQ-01, EC-02, EN-01

  5. C-f9e7a3aa8c

    Land cover is predominantly row crops (corn and soybeans).

    Quoted from page 1
    Land cover is predominantly row crops (corn and soybeans)

    Brook Hollow Project Overview 2023-03-15 · DR-0001 · Page 1 · 2023-03-15

    Source developer_document · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by EN-03 · Filed under EN-01, EN-03

  6. C-fe67965fc1

    An existing 138 kV transmission line crosses the eastern portion of the Project Area.

    Quoted from page 1
    An existing 138 kV transmission line crosses the eastern portion of the Project Area.

    Brook Hollow Project Overview 2023-03-15 · DR-0001 · Page 1 · 2023-03-15

    Source developer_document · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by PE-03 · Filed under EN-01, PE-03

Requirements and permits

The requirements the assessor tied to this row, by level. Each quote from dated law is shown with its source.

No requirement is tied to this row.

Information requests

  • IR-196b9ca318 · Medium priority

    Provide the alta/nsps survey or title commitment with easements for the project area, or confirm none exists.

    Missing evidence
    ALTA/NSPS survey or title commitment with easements
    Consequence
    Land Use and Site Features is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
  • IR-e8a82effe6 · Medium priority

    Provide the site layout or constraints map for the project area, or confirm none exists.

    Missing evidence
    Site layout or constraints map
    Consequence
    Land Use and Site Features is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness

Next steps

  • Identify line owner; obtain its setback and encroachment requirements.
  • Obtain ALTA survey/title commitment; confirm line location and easement width against parcel layout.
  • Remove Parcel 12 debris pile; check for adjacent protected or federal lands.

Agencies

  • Transmission line owner (unidentified)
  • County

Cost and impact

Impact
C
Potential cost level
L
Why

Setbacks and possible crossing agreements carry low cost; debris removal is negligible.

Impact: C = cost, S = schedule. Potential cost level: L, L-M, M, M-H, H (relative to a utility-scale solar budget).

Lumerian Labs 2026