Historic Structures and Districts: desk report
One row of the risk matrix, CU-02 Historic Structures and Districts, in the Cultural Resources section: what the record holds on it.
A desk review of the record as it stood: not a field survey and not a modelled study.
- Information cut-off
- 2023-08-15
- Row in the matrix
- CU-02 Historic Structures and Districts
Downloads
This report as a Word file, and the engine's own files for the whole run.
- This reportbrook-hollow-solar-CU-02.docx · Word · 40 KB
- The engine's risk matrixRiskMatrix_Brook_Hollow_Solar.xlsx · Excel · 35 KB
- The engine's permit matrixPermittingMatrix_Brook_Hollow_Solar.docx · Word · 42 KB
1Finding
Evidence insufficient to rate; an information request is listed
- The rule
Code computed the rating from the assessor's inputs:
present=unknown -> Unknown (abstain)
Set by the rule
- Decision
- Abstained (information request)
- Evidence state
- MISSING · no evidence in hand
The assessor's comments
No historic architecture survey or NRHP review is included in the data room. Presence of listed or eligible historic properties, including any associated with the Parcel 12 barn, is not addressed. A state inventory and NRHP database review would settle it.
Conclusion withheld
- Question
- Are there NRHP-listed or eligible historic structures, districts or landscapes in or near the Brook Hollow Solar study area?
- Missing evidence
- Historic architecture survey or NRHP/state inventory review.
- Consequence
- Section 106 or SHPO review scope, visual mitigation and schedule exposure cannot be determined.
- Information request
- Provide any historic architecture survey, SHPO correspondence or NRHP/state inventory review for the site, or authorize a desktop review.
- Blocks the decision
- No
2What the record shows
The five inputs
Present: unknown
No claim addresses listed or eligible historic properties in or near the study area. The only related claim (C-18f20d1141) notes a farm debris pile near a Parcel 12 barn; it says nothing about historic status or eligibility. Silence is not absence.
Cites C-18f20d1141
Extent: unknown
No historic properties are documented, so their position relative to the site is unknown.
Cites no claim.
Avoidable: unknown
Avoidability cannot be judged without documented historic properties.
Cites no claim.
Pathway: none
Placeholder because presence is unknown.
Cites no claim.
Impact likely: no
Placeholder because presence is unknown.
Cites no claim.
Supporting statements (1)
Each claim the row cites: the statement in the assessor's words, then the quote the engine found on the page.
C-18f20d1141
A small de minimis farm debris pile was observed near the Parcel 12 barn; removal is recommended.
Quoted from page 1 A small farm debris pile (de minimis) was observed near the Parcel 12 barn; removal is recommended.
Phase I ESA 2023-01-20 · DR-0004 · Page 1 · 2023-01-20
Source field_study · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100
3Permits and requirements
The requirements tied to the rows of this report, by level.
Engine 0.1.0, which made this run, wrote no timelines or citations of law.
Federal (1)
Section 106 consultation
F-NHPA106 · Lead federal agency with the State Historic Preservation Office (and THPOs)
- Applicability
- Conditional
- Instrument
- National Historic Preservation Act Section 106 (54 U.S.C. 306108); 36 CFR Part 800
- Trigger
- Federal nexus, for example an individual Section 404 permit or federal funding.
- Description
A federal undertaking (federal permit, funding, license or land) must take into account effects on historic properties.
- Verification
- PACK_PENDING_QUALIFIED_REVIEW
- Source
- pack:federal
- In the permit matrix
- F-NHPA106
State (1)
SHPO review; Section 106 consultation if a federal nexus exists; DNR Archaeology Plan/Permit for state-land or discovered human remains
S-06 · Indiana DNR Division of Historic Preservation and Archaeology (SHPO)
- Applicability
- Conditional
- Instrument
- IC 14-21-1 Historic Preservation and Archaeology Act, state permit
- Trigger
- Federal nexus (e.g. 404 permit) or discovery of burials/archaeological artifacts
- Description
No general state review for private land without a state or federal nexus, but SHPO consultation is triggered through federal permits. Inadvertent discovery of human remains or burials requires DNR notification under IC 14-21-1.
- As of the cut-off
As of 2023-08-15. Federal nexus is missing from the project facts.
- Verification
- MODEL_KNOWLEDGE_UNVERIFIED
- Source
- model:jurisdiction
- In the permit matrix
- S-06
4What is missing
The information requests the run raised for the rows of this report, by priority: what is missing, what follows from it, and whether it holds up the decision.
High priority (1)
IR-ac5fadd7ce · High priority
Provide the historic architecture survey or nrhp review for the project area, or confirm none exists.
- Missing evidence
- Historic architecture survey or NRHP review
- Consequence
- Historic Structures and Districts is rated on no evidence without it.
- Blocks the decision
- Yes
- Raised by
- completeness
Medium priority (1)
IR-a02194a069 · Medium priority
Are there NRHP-listed or eligible historic structures, districts or landscapes in or near the Brook Hollow Solar study area?
- Missing evidence
- Historic architecture survey or NRHP/state inventory review.
- Consequence
- Section 106 or SHPO review scope, visual mitigation and schedule exposure cannot be determined.
- Blocks the decision
- No
- Raised by
- abstention
5Next steps and agencies
Next steps
- Review Indiana SHPO inventory (IHSSI) and NRHP listings within and near the site.
- Commission a historic architecture survey and visual effects assessment if listed or eligible properties are found.
Agencies
- Indiana DNR DHPA (SHPO)
6Basis and limits
This report is a desk review of the documents quoted above, as the engine read them for an information cut-off of 2023-08-15.
It is not a field survey and not a modelled study: this review made no site visit and ran no acoustic, hydraulic or other model. Where the record is silent, the report says what is missing; it does not fill the gap.
Every statement, figure and quote is the engine's record as written. The headings and connecting words are fixed text of this room, the same in every report.
Documents quoted (1)
- Phase I ESA 2023-01-20 · DR-0004 · 2023-01-20 · page 1
Versions and data hashes
As the engine and the exporter recorded them. Hashes are SHA-256.
- Information cut-off
- 2023-08-15
- Engine version
- 0.1.0
- Prompt version
- 2026-10-02.1
- Rows pack
- rows.json sha256 d1df27b21f79b09d
- Federal pack
- federal.json sha256 aa17c41356542d46
- State pack
- none
- Local pack
- Not written by this engine
- Data room manifest
- 6141b7dc1f8441489d39e4023d551e4c0021a37ce4f9ad157607d9096c58bfb5
- Audit chain
- valid (92 events)
- QA status
- PASS
- Rendered at
- 2026-10-01T21:09:12+00:00
- Run record (annex)
- a03418c2562baa8a57b7c256ce665acd2c20e92d06e365604d162e9029f8fdd6
- Exporter
- Prism/room/exporter 1.4.0
Prism desk report · engine 0.1.0 · prompts 2026-10-02.1 · information cut-off 2023-08-15