Skip to content

Soils and Agricultural Resources

EN-03 · Matrix · Environmental Resources

Rating
UnknownEvidence insufficient to rate; an information request is listed
Why
Presence unknown
Worst case
Not above the rating
Evidence
Missing
Cited claims
5
Requirements
0
Requests
3

Rating

UnknownEvidence insufficient to rate; an information request is listed

The rule

Code computed the rating from the assessor's inputs:

present=unknown -> Unknown (abstain)

Set by the rule

Decision
Abstained (information request)
Evidence state
Missing · no evidence in hand

Conclusion withheld

Question
Does the site contain prime farmland or farmland of statewide importance, agricultural easements or preferential tax program enrollment, or drainage tile or regulated drains?
Missing evidence
No claims show a soil survey or farmland classification review, drainage tile survey or drainage district records, or title or tax program information.
Consequence
Farmland protection, tile repair and tax recoupment exposure cannot be rated; a binding easement or legal drain could materially change the risk.
Information request
NRCS soil map unit and farmland classification report, landowner tile maps, County Surveyor regulated drain records, title commitments and county ag tax program enrollment records for the 22 parcels.
Blocks the decision
No

Revision

First verdict
weakened
First critique

Abstention is appropriate given silent evidence. The comment's 1,050-acre site figure conflicts with the 1,356-acre project fact. It also overstates what the data room lacks. Next steps could add federal-nexus and legal-drain checks.

Revised once after the first critique. Rating unchanged.

The five inputs

  • Present: unknown

    Claims show row-crop land cover (C-f9e7a3aa8c), leased farmland (C-0ebae50e80) and A-1 Agricultural zoning (C-d8361ea2dc). Ordinary cropland and zoning are not by themselves a protected resource. No claim documents prime farmland or farmland of statewide importance, program enrollment, easements or drainage tile/legal drains. Tributaries draining western fields (C-d993df0dfd) are surface streams; whether any is a regulated drain is not shown. Upland soils on Parcel 7 (C-58cb5b6f6c) say nothing about farmland classification. No claim states these resources are absent, so presence is unknown. The critic's view that prime farmland and tile are likely in Indiana row-crop land is not evidenced here, so presence stays unknown.

    Cites C-f9e7a3aa8c, C-0ebae50e80, C-d8361ea2dc, C-d993df0dfd, C-58cb5b6f6c

  • Extent: unknown

    Presence of a protected farmland designation, program or drainage infrastructure is not documented, so extent cannot be assessed (C-f9e7a3aa8c, C-0ebae50e80).

    Cites C-f9e7a3aa8c, C-0ebae50e80

  • Avoidable: unknown

    No claim shows soil classification, easement, tax program or drainage records, so avoidability is not established. Conversion of undesignated cropland alone would be the project's purpose (C-f9e7a3aa8c).

    Cites C-f9e7a3aa8c

  • Pathway: none

    Placeholder because presence is unknown.

    Cites no claim.

  • Impact likely: no

    Placeholder because presence is unknown.

    Cites no claim.

Comments

Land cover is predominantly row crops (corn and soybeans), and parcels are zoned A-1 Agricultural. The overview cites approximately 1,050 acres of leased farmland, against a 1,356-acre project area. No soil classification, drainage tile, drain, easement or tax program information is shown; review of these would settle the row.

Critique

Verdict
upheld
Suggested direction for the rating
same
Summary

Abstention is appropriate, because no claim documents prime farmland, easements or drain records. The remaining issues are minor: the rationale includes meta-commentary about a prior critique, the avoidability wording is loose, and a few next steps are missing. The category should stay Unknown.

Critic model
Luminol

Issues

  1. Severity minor · Kind unsupported_statement

    The present rationale refers to "The critic's view that prime farmland and tile are likely in Indiana row-crop land". That is meta-commentary about a prior critique. It is not evidence, and it does not belong in the rationale.

    Cites C-f9e7a3aa8c

  2. Severity minor · Kind other

    The comment says the 1,050 leased acres are "against a 1,356-acre project area". The 1,356 acres is a project fact, so it is supported. The "overview" attribution is loose, and the comparison implies a mismatch that nothing explains. The comment's wording is minor.

    Cites C-0ebae50e80

  3. Severity minor · Kind wrong_input

    The avoidable rationale says conversion of cropland "would be the project's purpose". That is a judgment and not an evidence-based statement of avoidability. It is also tangled with the placeholder impact_likely=no. Abstention on presence is defensible, because no claim documents prime soils. Even so, row-crop land on 1,356 acres makes farmland conversion plausible, and the assessment should mark this as a high-probability open item. The 'no' placeholder for impact_likely could be misread as a finding.

    Cites C-f9e7a3aa8c

  4. Severity minor · Kind missing_next_step

    Next steps omit a request for the NRCS Web Soil Survey. They also omit screening for Indiana's Drainage Board and the state ag-related requirements, such as the Indiana Drainage Code. The rationale also leaves out the lease or landowner farm program enrollment, such as CRP. These are minor additions. The listed next steps are otherwise adequate.

Checks

  • Passed

    rating_has_evidence · blocking

  • Passed

    abstention_not_contradicted · blocking

  • Passed

    numbers_grounded · not blocking

  • Passed

    agencies_grounded · not blocking

  • Passed

    cutoff_respected · blocking

  • Passed

    abstention_complete · not blocking

  • Passed

    critic_not_refuted · blocking

Evidence (5)

Each claim the row cites: the statement in the assessor's words, then the quote the engine found on the page.

Brook Hollow Project Overview 2023-03-15

C-0ebae50e80 · Page 1 of 1 · DR-0001

Open the claim, C-0ebae50e80

The project covers approximately 1,050 acres of leased farmland.

Quote check Exact · Placed verbatim · The quote occurs on the page exactly as written. · Read as docx

Brook Hollow Solar Project Overview Date: March 15, 2023 SYNTHETIC TEST FIXTURE - FICTIONAL PROJECT Brook Hollow Solar is a proposed 120 MWac (approximately 160 MWdc) single-axis tracker solar project located in Fixture County, Indiana, Quote starts. on approximately 1,050 acres of leased farmland Quote ends.. The Project will interconnect at the Elm Grove 138 kV substation owned by Prairie Electric, under MISO queue position J1234. Target commercial operation date is December 2025. An existing 138 kV transmission line crosses the eastern portion of the Project Area. Site control consists of option-to-lease agreements with 14 landowners covering 22 parcels. Land cover is predominantly row crops (corn and soybeans) with scattered woodlots along Sugar Run.

This document has no page picture (only PDF and image documents have one).

  1. C-0ebae50e80

    The project covers approximately 1,050 acres of leased farmland.

    Quoted from page 1
    on approximately 1,050 acres of leased farmland

    Brook Hollow Project Overview 2023-03-15 · DR-0001 · Page 1 · 2023-03-15

    Source developer_document · Claim type project_fact · Polarity neutral · Confidence high · Quote check exact, 100 of 100

    Cited by EN-01 · Filed under EN-01, EN-03

  2. C-58cb5b6f6c

    Parcel 7 has upland soils and row crops with no hydric indicators.

    Quoted from page 3
    Upland soils, row crops, no hydric indicators.

    Wetland and Stream Delineation Report May2023 · DR-0005 · Page 3 · 2023-05-22

    Source field_study · Claim type presence · Polarity neutral · Confidence medium · Quote check exact, 100 of 100

    Cited by EN-01 · Filed under EN-01, EN-03

  3. C-d8361ea2dc

    The subject parcels are zoned A-1 Agricultural.

    Quoted from page 1
    The subject parcels are zoned A-1 Agricultural.

    Fixture County Zoning Verification Letter 2023-04-02 · DR-0007 · Page 1 · 2023-04-02

    Source agency_determination · Claim type regulatory · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by PE-01 · Filed under EN-03, PE-01

  4. C-d993df0dfd

    Two intermittent tributaries to Sugar Run drain the western fields.

    Quoted from page 2
    Two intermittent tributaries to Sugar Run drain the western fields.

    Wetland and Stream Delineation Report May2023 · DR-0005 · Page 2 · 2023-05-22

    Source field_study · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by AQ-01 · Filed under AQ-01

  5. C-f9e7a3aa8c

    Land cover is predominantly row crops (corn and soybeans).

    Quoted from page 1
    Land cover is predominantly row crops (corn and soybeans)

    Brook Hollow Project Overview 2023-03-15 · DR-0001 · Page 1 · 2023-03-15

    Source developer_document · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by EN-01 · Filed under EN-01, EN-03

Requirements and permits

The requirements the assessor tied to this row, by level. Each quote from dated law is shown with its source.

No requirement is tied to this row.

Also in the permit matrix for this row: F-FPPA, S-08

Information requests

  • IR-847cfb1cc8 · High priority

    Provide the soil survey or farmland classification review for the project area, or confirm none exists.

    Missing evidence
    Soil survey or farmland classification review
    Consequence
    Soils and Agricultural Resources is rated on no evidence without it.
    Blocks the decision
    Yes
    Raised by
    completeness
  • IR-23415860b5 · High priority

    Provide the drainage tile survey or drainage district records for the project area, or confirm none exists.

    Missing evidence
    Drainage tile survey or drainage district records
    Consequence
    Soils and Agricultural Resources is rated on no evidence without it.
    Blocks the decision
    Yes
    Raised by
    completeness
  • IR-69f418ce2f · Medium priority

    Does the site contain prime farmland or farmland of statewide importance, agricultural easements or preferential tax program enrollment, or drainage tile or regulated drains?

    Missing evidence
    No claims show a soil survey or farmland classification review, drainage tile survey or drainage district records, or title or tax program information.
    Consequence
    Farmland protection, tile repair and tax recoupment exposure cannot be rated; a binding easement or legal drain could materially change the risk.
    Blocks the decision
    No
    Raised by
    abstention

Next steps

  • Obtain NRCS farmland classification for all parcels; confirm whether any federal nexus exists (FPPA/AD-1006).
  • Interview landowners on tile; request County Surveyor regulated drain records, including Sugar Run tributaries.
  • Check title and tax records for ag easements or program enrollment.

Agencies

  • NRCS
  • Indiana DNR
  • County Drainage Board
  • County Surveyor

Cost and impact

Impact
None given.
Potential cost level
N/A
Why

Presence unknown; no cost exposure can be assessed.

Impact: C = cost, S = schedule. Potential cost level: L, L-M, M, M-H, H (relative to a utility-scale solar budget).