Tamsin Ridge Solar and Storage
This is a fictional demonstration project in which every organisation, person, parcel and finding is invented.
Option and Lease Summary - Tamsin Ridge Solar and Storage Project
C-04c97c05c7 · Page 1 of 2 · DR-0004 · 2023-05-30
The claim, in the assessor's words
Site control is through option-to-lease agreements on 12 of 14 parcels (1,063.4 acres) plus a recorded collection line easement on Parcel 7.
holds option-to-lease agreements on 12 of the 14 parcels (1,063.4 acres) and a
Source developer_document · Claim type project_fact · Polarity neutral · Confidence high · Quote check exact, 100 of 100
Cited by PE-05 Site Control and Land Rights · Filed under PE-05
States the fact land.control = option to lease on 12 of 14 parcels; recorded collection easement on Parcel 7
On the page
The page text exactly as the engine read it, with the quote marked.
Placed verbatim · The quote occurs on the page exactly as written.
Read as native
The page
The outline marks where the quote begins on the page.

Other claims quoted on this page
Lease requires lessee to remove facilities to 36 inches depth and restore soil within 12 months after lease end, with security posted.
Standard lease provides that lessee repairs or reroutes drain tile damaged by construction.