IR-a33eeefca9Provide the usace jurisdictional determination or agency waters correspondence for the project area, or confirm none exists.
AQ-01 Wetlands and WaterbodiesHigh priorityNocompleteness
  • IR-a33eeefca9 · High priority

    Provide the usace jurisdictional determination or agency waters correspondence for the project area, or confirm none exists.

    Missing evidence
    USACE jurisdictional determination or agency waters correspondence
    Consequence
    Wetlands and Waterbodies is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-9f6495626aProvide the desktop nwi/nhd water review or constraints mapping for the project area, or confirm none exists.
AQ-01 Wetlands and WaterbodiesHigh priorityNocompleteness
  • IR-9f6495626a · High priority

    Provide the desktop nwi/nhd water review or constraints mapping for the project area, or confirm none exists.

    Missing evidence
    Desktop NWI/NHD water review or constraints mapping
    Consequence
    Wetlands and Waterbodies is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-ba9d44c572Provide the ej screening (ejscreen/cejst/state tool) for the project area for the project area, or confirm none exists.
CO-01 Environmental JusticeHigh priorityYescompleteness
  • IR-ba9d44c572 · High priority

    Provide the ej screening (ejscreen/cejst/state tool) for the project area for the project area, or confirm none exists.

    Missing evidence
    EJ screening (EJScreen/CEJST/state tool) for the project area
    Consequence
    Environmental Justice is rated on no evidence without it.
    Blocks the decision
    Yes
    Raised by
    completeness
IR-ac5fadd7ceProvide the historic architecture survey or nrhp review for the project area, or confirm none exists.
CU-02 Architectural ResourcesHigh priorityYescompleteness
  • IR-ac5fadd7ce · High priority

    Provide the historic architecture survey or nrhp review for the project area, or confirm none exists.

    Missing evidence
    Historic architecture survey or NRHP review
    Consequence
    Architectural Resources is rated on no evidence without it.
    Blocks the decision
    Yes
    Raised by
    completeness
IR-5947855eaaProvide the ul 9540 listing and ul 9540a test reports (cell, module, unit and installation level) for the project area, or confirm none exists.
EG-04 Battery Storage Fire SafetyHigh priorityNocompleteness
  • IR-5947855eaa · High priority

    Provide the ul 9540 listing and ul 9540a test reports (cell, module, unit and installation level) for the project area, or confirm none exists.

    Missing evidence
    UL 9540 listing and UL 9540A test reports (cell, module, unit and installation level)
    Consequence
    Battery Storage Fire Safety is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-debe8f99e4Provide the hazard mitigation analysis, fire risk assessment or explosion control study for the project area, or confirm none exists.
EG-04 Battery Storage Fire SafetyHigh priorityNocompleteness
  • IR-debe8f99e4 · High priority

    Provide the hazard mitigation analysis, fire risk assessment or explosion control study for the project area, or confirm none exists.

    Missing evidence
    Hazard mitigation analysis, fire risk assessment or explosion control study
    Consequence
    Battery Storage Fire Safety is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-03be7e4172Provide the emergency response plan or fire department and fire marshal correspondence for the project area, or confirm none exists.
EG-04 Battery Storage Fire SafetyHigh priorityNocompleteness
  • IR-03be7e4172 · High priority

    Provide the emergency response plan or fire department and fire marshal correspondence for the project area, or confirm none exists.

    Missing evidence
    Emergency response plan or fire department and fire marshal correspondence
    Consequence
    Battery Storage Fire Safety is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-eb247a9fcdProvide the bess ordinance, moratorium or fire code adoption record for the project area, or confirm none exists.
EG-04 Battery Storage Fire SafetyHigh priorityNocompleteness
  • IR-eb247a9fcd · High priority

    Provide the bess ordinance, moratorium or fire code adoption record for the project area, or confirm none exists.

    Missing evidence
    BESS ordinance, moratorium or fire code adoption record
    Consequence
    Battery Storage Fire Safety is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-e8a82effe6Provide the site layout or constraints map for the project area, or confirm none exists.
EN-01 Land Use and Site FeaturesHigh priorityNocompleteness
  • IR-e8a82effe6 · High priority

    Provide the site layout or constraints map for the project area, or confirm none exists.

    Missing evidence
    Site layout or constraints map
    Consequence
    Land Use and Site Features is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-847cfb1cc8Provide the soil survey or farmland classification review for the project area, or confirm none exists.
EN-03 Agricultural ResourcesHigh priorityNocompleteness
  • IR-847cfb1cc8 · High priority

    Provide the soil survey or farmland classification review for the project area, or confirm none exists.

    Missing evidence
    Soil survey or farmland classification review
    Consequence
    Agricultural Resources is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-6b1aae03deProvide the regulatory database screen (federal epa and state contaminated-site, release and tank lists) for the project area, or confirm none exists.
EN-04 Environmental ContaminationHigh priorityNocompleteness
  • IR-6b1aae03de · High priority

    Provide the regulatory database screen (federal epa and state contaminated-site, release and tank lists) for the project area, or confirm none exists.

    Missing evidence
    Regulatory database screen (federal EPA and state contaminated-site, release and tank lists)
    Consequence
    Environmental Contamination is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-5306f8c3acProvide the epa green book or state attainment-status record for the project area, or confirm none exists.
EN-06 Air QualityHigh priorityYescompleteness
  • IR-5306f8c3ac · High priority

    Provide the epa green book or state attainment-status record for the project area, or confirm none exists.

    Missing evidence
    EPA Green Book or state attainment-status record
    Consequence
    Air Quality is rated on no evidence without it.
    Blocks the decision
    Yes
    Raised by
    completeness
IR-da39b42310Provide the state air permit, registration or exemption determination for the project area, or confirm none exists.
EN-06 Air QualityHigh priorityYescompleteness
  • IR-da39b42310 · High priority

    Provide the state air permit, registration or exemption determination for the project area, or confirm none exists.

    Missing evidence
    State air permit, registration or exemption determination
    Consequence
    Air Quality is rated on no evidence without it.
    Blocks the decision
    Yes
    Raised by
    completeness
IR-f2153419edProvide the permitting plan or schedule for the project area, or confirm none exists.
PE-01 Local Zoning & PermittingHigh priorityNocompleteness
  • IR-f2153419ed · High priority

    Provide the permitting plan or schedule for the project area, or confirm none exists.

    Missing evidence
    Permitting plan or schedule
    Consequence
    Local Zoning & Permitting is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-b24dc38cf1Provide the executed or draft interconnection agreement for the project area, or confirm none exists.
PE-04 Interconnection and TransmissionHigh priorityNocompleteness
  • IR-b24dc38cf1 · High priority

    Provide the executed or draft interconnection agreement for the project area, or confirm none exists.

    Missing evidence
    Executed or draft interconnection agreement
    Consequence
    Interconnection and Transmission is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-78fe2a615aProvide the gen-tie route study, line siting application or route map for the project area, or confirm none exists.
PE-04 Interconnection and TransmissionHigh priorityNocompleteness
  • IR-78fe2a615a · High priority

    Provide the gen-tie route study, line siting application or route map for the project area, or confirm none exists.

    Missing evidence
    Gen-tie route study, line siting application or route map
    Consequence
    Interconnection and Transmission is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-7d328a6772Provide the mineral ownership or surface-use review for the project area, or confirm none exists.
PE-05 Site Control and Land RightsHigh priorityNocompleteness
  • IR-7d328a6772 · High priority

    Provide the mineral ownership or surface-use review for the project area, or confirm none exists.

    Missing evidence
    Mineral ownership or surface-use review
    Consequence
    Site Control and Land Rights is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-5f0015e952Provide the parcel control table or site control summary for the project area, or confirm none exists.
PE-05 Site Control and Land RightsHigh priorityNocompleteness
  • IR-5f0015e952 · High priority

    Provide the parcel control table or site control summary for the project area, or confirm none exists.

    Missing evidence
    Parcel control table or site control summary
    Consequence
    Site Control and Land Rights is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-0a712115cdProvide the financial assurance instrument or terms (bond, letter of credit, escrow, parent guarantee) for the project area, or confirm none exists.
PE-06 Decommissioning and Financial AssuranceHigh priorityNocompleteness
  • IR-0a712115cd · High priority

    Provide the financial assurance instrument or terms (bond, letter of credit, escrow, parent guarantee) for the project area, or confirm none exists.

    Missing evidence
    Financial assurance instrument or terms (bond, letter of credit, escrow, parent guarantee)
    Consequence
    Decommissioning and Financial Assurance is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-9c85d7f357Provide the state or local decommissioning rule or permit condition for the project area, or confirm none exists.
PE-06 Decommissioning and Financial AssuranceHigh priorityNocompleteness
  • IR-9c85d7f357 · High priority

    Provide the state or local decommissioning rule or permit condition for the project area, or confirm none exists.

    Missing evidence
    State or local decommissioning rule or permit condition
    Consequence
    Decommissioning and Financial Assurance is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-293cbb6a38Are low-income, minority or overburdened communities identified near the project site?
CO-01 Environmental JusticeMedium priorityNoabstention
  • IR-293cbb6a38 · Medium priority

    Are low-income, minority or overburdened communities identified near the project site?

    Missing evidence
    EJ screening (EJScreen/CEJST/state tool) for the project area.
    Consequence
    Without a screen, the EJ engagement and any siting-process EJ considerations cannot be rated.
    Blocks the decision
    No
    Raised by
    abstention
IR-701f687e7fProvide the noise ordinance, state noise standard or permit condition for the project area, or confirm none exists.
CO-03 NoiseMedium priorityNocompleteness
  • IR-701f687e7f · Medium priority

    Provide the noise ordinance, state noise standard or permit condition for the project area, or confirm none exists.

    Missing evidence
    Noise ordinance, state noise standard or permit condition
    Consequence
    Noise is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-38364f5c1fProvide the receptor map or table of homes and noise-sensitive uses for the project area, or confirm none exists.
CO-03 NoiseMedium priorityNocompleteness
  • IR-38364f5c1f · Medium priority

    Provide the receptor map or table of homes and noise-sensitive uses for the project area, or confirm none exists.

    Missing evidence
    Receptor map or table of homes and noise-sensitive uses
    Consequence
    Noise is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-da0e177ed0Provide the construction noise, pile driving or blasting plan for the project area, or confirm none exists.
CO-03 NoiseMedium priorityNocompleteness
  • IR-da0e177ed0 · Medium priority

    Provide the construction noise, pile driving or blasting plan for the project area, or confirm none exists.

    Missing evidence
    Construction noise, pile driving or blasting plan
    Consequence
    Noise is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-1be216979fProvide the shpo / thpo correspondence for the project area, or confirm none exists.
CU-01 Archaeological Resources and CemeteriesMedium priorityNocompleteness
  • IR-1be216979f · Medium priority

    Provide the shpo / thpo correspondence for the project area, or confirm none exists.

    Missing evidence
    SHPO / THPO correspondence
    Consequence
    Archaeological Resources and Cemeteries is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-9698e54821Are there NRHP-listed or eligible architectural resources in or near the Tamsin Ridge site?
CU-02 Architectural ResourcesMedium priorityNoabstention
  • IR-9698e54821 · Medium priority

    Are there NRHP-listed or eligible architectural resources in or near the Tamsin Ridge site?

    Missing evidence
    Historic architecture survey or NRHP review; the Phase I study excluded above-ground resources.
    Consequence
    Rating cannot be set; potential visual or physical effects and any Section 106 or OPSB mitigation are unquantified.
    Blocks the decision
    No
    Raised by
    abstention
IR-c5e9053166Provide the eagle nest review or avian survey for the project area, or confirm none exists.
EC-02 Non-RTE SpeciesMedium priorityNocompleteness
  • IR-c5e9053166 · Medium priority

    Provide the eagle nest review or avian survey for the project area, or confirm none exists.

    Missing evidence
    Eagle nest review or avian survey
    Consequence
    Non-RTE Species is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-8469920792Provide the wildlife agency correspondence for the project area, or confirm none exists.
EC-02 Non-RTE SpeciesMedium priorityNocompleteness
  • IR-8469920792 · Medium priority

    Provide the wildlife agency correspondence for the project area, or confirm none exists.

    Missing evidence
    Wildlife agency correspondence
    Consequence
    Non-RTE Species is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-6d6395d79eProvide the state natural heritage, forestry or wildlife agency review for the project area, or confirm none exists.
EC-03 Vegetation and HabitatMedium priorityNocompleteness
  • IR-6d6395d79e · Medium priority

    Provide the state natural heritage, forestry or wildlife agency review for the project area, or confirm none exists.

    Missing evidence
    State natural heritage, forestry or wildlife agency review
    Consequence
    Vegetation and Habitat is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-9dd4e3bc70Provide the land cover or aerial imagery screen with clearing acreage for the project area, or confirm none exists.
EC-03 Vegetation and HabitatMedium priorityNocompleteness
  • IR-9dd4e3bc70 · Medium priority

    Provide the land cover or aerial imagery screen with clearing acreage for the project area, or confirm none exists.

    Missing evidence
    Land cover or aerial imagery screen with clearing acreage
    Consequence
    Vegetation and Habitat is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-8e1b822079Provide the vegetation management, revegetation or invasive species plan for the project area, or confirm none exists.
EC-03 Vegetation and HabitatMedium priorityNocompleteness
  • IR-8e1b822079 · Medium priority

    Provide the vegetation management, revegetation or invasive species plan for the project area, or confirm none exists.

    Missing evidence
    Vegetation management, revegetation or invasive species plan
    Consequence
    Vegetation and Habitat is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-29617d468aProvide the civil design, grading plan or topographic survey for the project area, or confirm none exists.
EG-01 Civil EngineeringMedium priorityNocompleteness
  • IR-29617d468a · Medium priority

    Provide the civil design, grading plan or topographic survey for the project area, or confirm none exists.

    Missing evidence
    Civil design, grading plan or topographic survey
    Consequence
    Civil Engineering is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-295dde238bProvide the desktop terrain and soil engineering data (dem slope, soil survey) for the project area, or confirm none exists.
EG-01 Civil EngineeringMedium priorityNocompleteness
  • IR-295dde238b · Medium priority

    Provide the desktop terrain and soil engineering data (dem slope, soil survey) for the project area, or confirm none exists.

    Missing evidence
    Desktop terrain and soil engineering data (DEM slope, soil survey)
    Consequence
    Civil Engineering is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-e76fc59c83Provide the erosion and sediment control plan or land-disturbance approval for the project area, or confirm none exists.
EG-02 StormwaterMedium priorityNocompleteness
  • IR-e76fc59c83 · Medium priority

    Provide the erosion and sediment control plan or land-disturbance approval for the project area, or confirm none exists.

    Missing evidence
    Erosion and sediment control plan or land-disturbance approval
    Consequence
    Stormwater is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-aa6d2bc62dProvide the desktop hydrology: soils, slope and receiving-water data for the project area, or confirm none exists.
EG-02 StormwaterMedium priorityNocompleteness
  • IR-aa6d2bc62d · Medium priority

    Provide the desktop hydrology: soils, slope and receiving-water data for the project area, or confirm none exists.

    Missing evidence
    Desktop hydrology: soils, slope and receiving-water data
    Consequence
    Stormwater is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-8da44993cdProvide the road use agreement, road maintenance agreement or road damage bond for the project area, or confirm none exists.
EG-03 Transportation and AccessMedium priorityNocompleteness
  • IR-8da44993cd · Medium priority

    Provide the road use agreement, road maintenance agreement or road damage bond for the project area, or confirm none exists.

    Missing evidence
    Road use agreement, road maintenance agreement or road damage bond
    Consequence
    Transportation and Access is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-50f7f283e9Provide the oversize and overweight transport permit plan for the project area, or confirm none exists.
EG-03 Transportation and AccessMedium priorityNocompleteness
  • IR-50f7f283e9 · Medium priority

    Provide the oversize and overweight transport permit plan for the project area, or confirm none exists.

    Missing evidence
    Oversize and overweight transport permit plan
    Consequence
    Transportation and Access is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-66c5dc2424Provide the karst, mine or oil and gas well mapping for the project area, or confirm none exists.
EN-02 Geotechnical and SoilsMedium priorityNocompleteness
  • IR-66c5dc2424 · Medium priority

    Provide the karst, mine or oil and gas well mapping for the project area, or confirm none exists.

    Missing evidence
    Karst, mine or oil and gas well mapping
    Consequence
    Geotechnical and Soils is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-d977f3a3e8What is the NAAQS attainment status of Carroll County, OH, and does the project need an air permit or exemption?
EN-06 Air QualityMedium priorityNoabstention
  • IR-d977f3a3e8 · Medium priority

    What is the NAAQS attainment status of Carroll County, OH, and does the project need an air permit or exemption?

    Missing evidence
    EPA Green Book or Ohio EPA attainment record; Ohio EPA air permit, registration or exemption determination.
    Consequence
    Without it, nonattainment or conformity constraints and generator permitting cannot be ruled in or out.
    Blocks the decision
    No
    Raised by
    abstention
IR-96d020deb4Provide the hazard or climate risk screen (national hazard index, wildfire risk map, hail or tornado frequency data, lender or insurer screen) for the project area, or confirm none exists.
EN-08 Natural Hazards and Climate ExposureMedium priorityNocompleteness
  • IR-96d020deb4 · Medium priority

    Provide the hazard or climate risk screen (national hazard index, wildfire risk map, hail or tornado frequency data, lender or insurer screen) for the project area, or confirm none exists.

    Missing evidence
    Hazard or climate risk screen (national hazard index, wildfire risk map, hail or tornado frequency data, lender or insurer screen)
    Consequence
    Natural Hazards and Climate Exposure is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-0011d0e4edProvide the design basis report or engineering study (design wind speed, snow and ice loads, module hail rating, stow strategy, design temperature) for the project area, or confirm none exists.
EN-08 Natural Hazards and Climate ExposureMedium priorityNocompleteness
  • IR-0011d0e4ed · Medium priority

    Provide the design basis report or engineering study (design wind speed, snow and ice loads, module hail rating, stow strategy, design temperature) for the project area, or confirm none exists.

    Missing evidence
    Design basis report or engineering study (design wind speed, snow and ice loads, module hail rating, stow strategy, design temperature)
    Consequence
    Natural Hazards and Climate Exposure is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-248c346d8eProvide the wildfire hazard zone designation, wildfire protection plan, or local flood, drainage and dam inundation history beyond fema mapping for the project area, or confirm none exists.
EN-08 Natural Hazards and Climate ExposureMedium priorityNocompleteness
  • IR-248c346d8e · Medium priority

    Provide the wildfire hazard zone designation, wildfire protection plan, or local flood, drainage and dam inundation history beyond fema mapping for the project area, or confirm none exists.

    Missing evidence
    Wildfire hazard zone designation, wildfire protection plan, or local flood, drainage and dam inundation history beyond FEMA mapping
    Consequence
    Natural Hazards and Climate Exposure is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-09b3f986d4Provide the evidence of federal land, funding or permits for the project area, or confirm none exists.
PE-03 OtherMedium priorityNocompleteness
  • IR-09b3f986d4 · Medium priority

    Provide the evidence of federal land, funding or permits for the project area, or confirm none exists.

    Missing evidence
    Evidence of federal land, funding or permits
    Consequence
    Other is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-a4070979c7Provide the dated record of local and state siting decisions in the region (engine context check) for the project area, or confirm none exists.
PE-07 Regional Siting ClimateMedium priorityNocompleteness
  • IR-a4070979c7 · Medium priority

    Provide the dated record of local and state siting decisions in the region (engine context check) for the project area, or confirm none exists.

    Missing evidence
    Dated record of local and state siting decisions in the region (engine context check)
    Consequence
    Regional Siting Climate is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-e0cf50bd46Provide the wellhead or source-water protection area map, sole-source aquifer map or state drinking-water program determination for the project area, or confirm none exists.
AQ-03 Groundwater and Water SupplyLow priorityNocompleteness
  • IR-e0cf50bd46 · Low priority

    Provide the wellhead or source-water protection area map, sole-source aquifer map or state drinking-water program determination for the project area, or confirm none exists.

    Missing evidence
    Wellhead or source-water protection area map, sole-source aquifer map or state drinking-water program determination
    Consequence
    Groundwater and Water Supply is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-5b67c80546Provide the private well survey, water well records or hydrogeologic desktop study for the project area, or confirm none exists.
AQ-03 Groundwater and Water SupplyLow priorityNocompleteness
  • IR-5b67c80546 · Low priority

    Provide the private well survey, water well records or hydrogeologic desktop study for the project area, or confirm none exists.

    Missing evidence
    Private well survey, water well records or hydrogeologic desktop study
    Consequence
    Groundwater and Water Supply is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-6b1d8f8529Provide the water supply plan, will-serve letter or water withdrawal permit (construction, panel washing, fire water) for the project area, or confirm none exists.
AQ-03 Groundwater and Water SupplyLow priorityNocompleteness
  • IR-6b1d8f8529 · Low priority

    Provide the water supply plan, will-serve letter or water withdrawal permit (construction, panel washing, fire water) for the project area, or confirm none exists.

    Missing evidence
    Water supply plan, will-serve letter or water withdrawal permit (construction, panel washing, fire water)
    Consequence
    Groundwater and Water Supply is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-cc073e636dProvide the protected-area database screen or protected lands map (national, state and local layers) for the project area, or confirm none exists.
EN-07 Protected Lands and RecreationLow priorityNocompleteness
  • IR-cc073e636d · Low priority

    Provide the protected-area database screen or protected lands map (national, state and local layers) for the project area, or confirm none exists.

    Missing evidence
    Protected-area database screen or protected lands map (national, state and local layers)
    Consequence
    Protected Lands and Recreation is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-612eae23b5Provide the land-management or recreation agency correspondence (park, refuge, forest, trail or scenic river managing body) for the project area, or confirm none exists.
EN-07 Protected Lands and RecreationLow priorityNocompleteness
  • IR-612eae23b5 · Low priority

    Provide the land-management or recreation agency correspondence (park, refuge, forest, trail or scenic river managing body) for the project area, or confirm none exists.

    Missing evidence
    Land-management or recreation agency correspondence (park, refuge, forest, trail or scenic river managing body)
    Consequence
    Protected Lands and Recreation is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
IR-d0e0b554ecProvide the recreation and hunting area review for the project area, or confirm none exists.
EN-07 Protected Lands and RecreationLow priorityNocompleteness
  • IR-d0e0b554ec · Low priority

    Provide the recreation and hunting area review for the project area, or confirm none exists.

    Missing evidence
    Recreation and hunting area review
    Consequence
    Protected Lands and Recreation is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness

Lumerian Labs 2026