Skip to content

Documents

?

Every document in the data room: read, duplicate or quarantined, with the reason.

Documents
30
Quarantined
2

Documents (30)

DocumentStatusDatedPagesReadClaims
Tamsin Ridge Solar and Storage Project - Project DescriptionDR-0001
Active2023-06-121111
Path
01 Project/Tamsin_Ridge_Project_Description_2023-06-12.docx
Status
active
Dated
2023-06-12
Pages
1 of 1 read
Read as
docx 1
Underground Collection Line Easement Agreement - Parcel 7DR-0003
Active2022-11-03224
Path
02 Land and Title/Collection_Line_Easement_Parcel_7_recorded_2022-11-03.pdf
Status
active
Dated
2022-11-03
Pages
2 of 2 read
Read as
native 2
Claims on this document (4)
C-d257ecfe8e, C-50cd3eb7bc, C-f23d5887f3, C-4e2febbe42
Option and Lease Summary - Tamsin Ridge Solar and Storage ProjectDR-0004
Active2023-05-302215
Path
02 Land and Title/Option_and_Lease_Summary_2023-05-30.pdf
Status
active
Dated
2023-05-30
Pages
2 of 2 read
Read as
native 2
Parcel Schedule 2023-07-14DR-0005
Active2023-07-14225
Path
02 Land and Title/Parcel_Schedule_2023-07-14.xlsx
Status
active
Dated
2023-07-14
Pages
2 of 2 read
Read as
xlsx 2
Commitment for Title Insurance No. ATA-23-0418 (Parcels 2, 5 and 9)DR-0006
Active2023-04-183313
Path
02 Land and Title/Title_Commitment_ATA-23-0418_Parcels_2_5_9.pdf
Status
active
Dated
2023-04-18
Pages
3 of 3 read
Read as
native 3
Bat Habitat Assessment and Vegetation Survey - Tamsin Ridge Solar and Storage ProjectDR-0007
Active2023-06-202217
Path
03 Environmental/Bat_Habitat_and_Vegetation_Survey_2023-06-20.pdf
Status
active
Dated
2023-06-20
Pages
2 of 2 read
Read as
native 2
Cultural Resources Literature Review and Phase I Archaeological Survey - Tamsin RidgeDR-0008
Active2023-06-303314
Path
03 Environmental/Cultural_Resources_Literature_Review_and_Phase_I_Archaeology_2023-06-30.pdf
Status
active
Dated
2023-06-30
Pages
3 of 3 read
Read as
native 3
Standard Flood Hazard Determination - Tamsin Ridge Parcels 5, 9 and 10DR-0009
Active2023-03-15118
Path
03 Environmental/Flood_Hazard_Determination_2023-03-15.pdf
Status
active
Dated
2023-03-15
Pages
1 of 1 read
Read as
native 1
Official Species List - Tamsin Ridge Solar and StorageDR-0010
Active2023-04-12117
Path
03 Environmental/IPaC_Official_Species_List_2023-04-12.pdf
Status
active
Dated
2023-04-12
Pages
1 of 1 read
Read as
native 1
ODNR Environmental Review - Tamsin Ridge Solar and Storage Project (ODNR 23-0477)DR-0011
Active2023-05-022215
Path
03 Environmental/ODNR_Environmental_Review_Letter_2023-05-02.pdf
Status
active
Dated
2023-05-02
Pages
2 of 2 read
Read as
native 1, ocr 1
Phase I Environmental Site Assessment - Tamsin Ridge Solar and Storage ProjectDR-0012
Active2023-01-273319
Path
03 Environmental/Phase_I_ESA_2023-01-27.pdf
Status
active
Dated
2023-01-27
Pages
3 of 3 read
Read as
native 3
Wetland and Stream Delineation Report - Tamsin Ridge Solar and Storage ProjectDR-0013
Active2023-05-223316
Path
03 Environmental/Wetland_and_Stream_Delineation_Report_2023-05-22.pdf
Status
active
Dated
2023-05-22
Pages
3 of 3 read
Read as
native 3
Battery Energy Storage System Fire Safety Narrative - Tamsin RidgeDR-0014
Active2023-06-282213
Path
04 Engineering/BESS_Fire_Safety_Narrative_2023-06-28.pdf
Status
active
Dated
2023-06-28
Pages
2 of 2 read
Read as
native 2
Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage ProjectDR-0015
Active2023-04-252218
Path
04 Engineering/Glare_Aviation_and_Visual_Memo_2023-04-25.pdf
Status
active
Dated
2023-04-25
Pages
2 of 2 read
Read as
native 2
Noise Assessment - Tamsin Ridge Solar and Storage ProjectDR-0016
Active2023-07-103311
Path
04 Engineering/Noise_Assessment_2023-07-10.pdf
Status
active
Dated
2023-07-10
Pages
3 of 3 read
Read as
native 3
Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage ProjectDR-0018
Active2023-05-153320
Path
04 Engineering/Preliminary_Geotechnical_Report_2023-05-15.pdf
Status
active
Dated
2023-05-15
Pages
3 of 3 read
Read as
native 3
Stormwater, Floodplain and Drainage Memo - Tamsin Ridge Solar and Storage ProjectDR-0019
Active2023-06-053324
Path
04 Engineering/Stormwater_Floodplain_and_Drainage_Memo_2023-06-05.pdf
Status
active
Dated
2023-06-05
Pages
3 of 3 read
Read as
native 3
Traffic and Access Memo - Tamsin Ridge Solar and Storage ProjectDR-0020
Active2023-06-19227
Path
04 Engineering/Traffic_and_Access_Memo_2023-06-19.pdf
Status
active
Dated
2023-06-19
Pages
2 of 2 read
Read as
native 2
Generation Interconnection Feasibility Study Report - Queue Position AH1-931DR-0021
Active2022-04-14229
Path
05 Interconnection/PJM_AH1-931_Feasibility_Study_Report_2022-04-14.pdf
Status
active
Dated
2022-04-14
Pages
2 of 2 read
Read as
native 2
Zoning Verification - Tamsin Ridge Solar and Storage ProjectDR-0022
Active2023-02-14115
Path
06 Permitting/Carroll_County_Zoning_Verification_Letter_2023-02-14.pdf
Status
active
Dated
2023-02-14
Pages
1 of 1 read
Read as
native 1
Summary of the County Public Meeting under ORC 303.61 - Tamsin RidgeDR-0023
Active2023-05-121115
Path
06 Permitting/County_Public_Meeting_Summary_2023-05-11.docx
Status
active
Dated
2023-05-12
Pages
1 of 1 read
Read as
docx 1
Preliminary Decommissioning Plan and Cost Estimate - Tamsin Ridge Solar and Storage ProjectDR-0024
Active2023-03-20227
Path
06 Permitting/Decommissioning_Plan_2023-03-20.pdf
Status
active
Dated
2023-03-20
Pages
2 of 2 read
Read as
native 2
OPSB Pre-Application Conference Summary - Tamsin Ridge Solar and Storage ProjectDR-0026
Active2023-03-282219
Path
06 Permitting/OPSB_Pre-Application_Conference_Summary_2023-03-28.pdf
Status
active
Dated
2023-03-28
Pages
2 of 2 read
Read as
native 2
Email: RE: Haul route and county road permits - Tamsin RidgeDR-0027
Active2023-07-06116
Path
07 Correspondence/RE_Haul_route_and_county_road_permits.eml
Status
active
Dated
2023-07-06
Pages
1 of 1 read
Read as
email 1
Tamsin Ridge Project BoundaryDR-0028
Active2023-07-01110
Path
08 GIS/Tamsin_Ridge_Project_Boundary.kml
Status
active
Dated
2023-07-01
Pages
1 of 1 read
Read as
geometry 1
Haul Route Review Comments - Tamsin Ridge Solar and Storage ProjectDR-0029
Active2023-07-05118
Path
07 Correspondence/RE_Haul_route_and_county_road_permits.eml!/County_Engineer_Haul_Route_Comments.pdf
Status
active
Dated
2023-07-05
Pages
1 of 1 read
Read as
native 1
Context check: Local veto and restriction powers: exemptions and grandfatheringCX-0030
ActiveUndated302

Context document: written by the engine's context stage, not a file from the data room.

Path
_context/applicability.txt
Status
active
Dated
Undated
Pages
0 of 3 read
Notes

Engine-generated context check (ok).

Claims on this document (2)
C-5d2a9e4a3a, C-d95cdabeb7
Copy of Tamsin_Ridge_Project_Description.docx (no title recorded)DR-0002
DuplicateUndated000
Path
01 Project/old/Copy of Tamsin_Ridge_Project_Description.docx
Status
duplicate
Dated
Undated
Pages
0 of 0 read
Noise Assessment Rev. B - Tamsin Ridge Solar and Storage ProjectDR-0017
Quarantined2023-10-20100
Path
04 Engineering/Noise_Assessment_Rev_B_2023-10-20.pdf
Status
quarantined
Dated
2023-10-20
Pages
0 of 1 read
Held because
  • Q2_after_cutoff · dated 2023-10-20 (first-page text) after cut-off 2023-08-01
Fatal_Flaw_Summary_DRAFT_2022-11.pdf (no title recorded)DR-0025
QuarantinedUndated000
Path
06 Permitting/Fatal_Flaw_Summary_DRAFT_2022-11.pdf
Status
quarantined
Dated
Undated
Pages
0 of 0 read
Notes

Q1 answer-leak path match at intake: never extracted or read.

Held because
  • Q1_answer_leak · title/path matches ['fatal[\\s_-]*flaw']