Cultural Resources Literature Review and Phase I Archaeological Survey - Tamsin Ridge

C-1134e16733 · Page 3 of 3 · DR-0008 · 2023-06-30

The claim, in the assessor's words

Protect the cemetery with a 100-foot buffer, fenced during construction, after a ground-penetrating radar survey; moving any burial requires disinterment under ORC 517.23 and 517.24.

Quoted from page 3
Moving any burial would require disinterment under ORC 517.23 and 517.24.

Source consultant_memo · Claim type recommendation · Polarity neutral · Confidence high · Quote check exact, 100 of 100

Cited by CU-01 Archaeological Resources and Cemeteries · Filed under CU-01

On the page

The page text exactly as the engine read it, with the quote marked.

Placed normalised · The quote matches the page once line breaks, hyphenation, case and punctuation are set aside, as the engine's matcher compares text. The marked words are the page's own.

Read as native

Go to the marked quote

Cultural Resources Literature Review and Phase I Archaeological Survey - Tamsin Ridge Recommendations • Avoid site 33-CR-0412 with a 50-foot buffer by adjusting the layout; if avoidance is not possible, carry out Phase II testing before construction. • Protect the Pettibone Family Cemetery with a 100-foot buffer shown on plans and fenced during construction, after a ground-penetrating radar survey of the buffer to locate any unmarked graves. Quote starts. Moving any burial would require disinterment under ORC 517.23 and 517.24. Quote ends. • Adopt an unanticipated discovery plan: if human remains or archaeological deposits are found, stop work within 100 feet and notify the county coroner, law enforcement and the SHPO. Agency coordination The OPSB application must map cultural resources and describe how impacts are avoided. Cinderhill will submit this report to the SHPO for review with the OPSB application. If a Corps permit with pre-construction notification is needed, the Corps will also consult the SHPO and Native American tribes with interests in Ohio under Section 106 (54 U.S.C. 306108); no tribal consultation has taken place yet. Ruth Ellery, RPA, Principal Investigator, Cinderhill Archaeological Services. Cinderhill Archaeological Services - Report CAS-2023-19 Page 3 of 3

The page

The outline marks where the quote begins on the page.

Page 3 of Cultural Resources Literature Review and Phase I Archaeological Survey - Tamsin Ridge

Other claims quoted on this page

  • C-4d507135cc

    Adopt an unanticipated discovery plan: stop work within 100 feet and notify coroner, law enforcement and SHPO if remains or deposits are found.

  • C-37779bcd55

    The OPSB application must map cultural resources and describe how impacts are avoided; the report will go to the SHPO with the application.

  • C-f5449d6a0d

    If a Corps permit with pre-construction notification is needed, the Corps will consult the SHPO and tribes under Section 106; no tribal consultation has taken place yet.