Carroll County, Ohio, Recorder. Instrument 202200004417. Recorded November 3, 2022 at 10:14 a.m. Fee $76.00. Return
to: Whitlock Ames LLP, Columbus, Ohio.
Underground Collection Line Easement Agreement
This Underground Collection Line Easement Agreement (the Agreement) is made on October 21, 2022 between
Delphine Asquith, unmarried (Grantor), and Tamsin Ridge Solar, LLC, an Ohio limited liability company
(Grantee).
1. Grant. For good and valuable consideration, Grantor grants to Grantee a non-exclusive easement thirty (30)
feet wide (the Easement Area) over, under and across Grantor's land in Harrison Township, Carroll County,
Ohio, county parcel 21-00702.000, as shown in Exhibit A, to install, operate, maintain, replace and remove
underground electric collection lines of up to 34.5 kV, communication cables and related equipment serving the
Tamsin Ridge Solar and Storage Project.
2. Temporary construction easement. During construction and any later repair, Grantee may use a strip sixty
(60) feet wide centered on the Easement Area. The temporary easement ends when construction is complete
and the surface is restored.
3. Depth and crossings. Cables will be buried at least forty-two (42) inches below the surface. Where the
Easement Area crosses the natural gas gathering line of Calder Gathering Company, LLC, Grantee will obtain
that company's written crossing agreement and keep the clearance it requires.
4. Restoration. Grantee will segregate topsoil, Quote starts. repair or reroute any drain tile it damages within thirty (30) days Quote ends.,
restore fences and pay for crop damage at the county extension office's published rates.
5. Grantor's use. Grantor may farm the Easement Area but may not build structures, plant trees or change the
grade within it, or grant another easement that conflicts with it.
6. Term. The easement lasts as long as the Tamsin Ridge Solar and Storage Project operates and ends two (2)
years after it permanently stops operating. Within that period Grantee will remove all above-ground equipment
and either remove the cables or, at Grantor's written election, leave cables buried forty-two (42) inches or
deeper in place, and will record a release of this easement.