Option and Lease Summary - Tamsin Ridge Solar and Storage Project

C-f20a02cd94 · Page 2 of 2 · DR-0004 · 2023-05-30

The claim, in the assessor's words

Good neighbor agreements with payments and screening were offered to owners of 14 nearby non-participating residences; three have signed.

Quoted from page 2
Three have signed.

Source developer_document · Claim type stakeholder · Polarity neutral · Confidence medium · Quote check exact, 100 of 100

Cited by CO-02 Community Engagement & Relations, VI-01 Visual Resources & Aesthetics · Filed under CO-02, VI-01

On the page

The page text exactly as the engine read it, with the quote marked.

Placed verbatim · The quote occurs on the page exactly as written.

Read as native

Go to the marked quote

Option and Lease Summary - Tamsin Ridge 3. Issues for the site control plan Parcel 11 (holdout). Parcel 11 lies between the West Block and the East Block. The planned collection route and the East Block access road cross it. The trustee has declined the standard option twice and asked for a purchase price well above appraisal. Without Parcel 11, the collection line would follow Linnet Road in the county road right-of-way for about 1.3 miles, which needs a county right-of-way permit and adds cost. No condemnation power is available to the Project. Oil and gas lease on Parcels 2 and 5. Both parcels are subject to a 2012 oil and gas lease to Brenwick Exploration, LLC, pooled into a Utica unit. The lease lets the lessee use the surface for wells, pads, roads and pipelines and does not limit where. The lessee's planned second pad on Parcel 2 overlaps about 9 acres of the array layout. An accommodation agreement with Brenwick, fixing pad and pipeline corridors outside the array, is in draft and not signed. Until it is, a lender will see an unsubordinated surface use right. Coal reservation on Parcel 9. A 1912 deed severed the coal beneath Parcel 9 and reserved the right to mine it by underground methods without liability for surface damage. The coal was largely mined out by the Elsby No. 2 Mine, but the reservation remains of record and title will except it. Mortgage on Parcel 9. A 2017 mortgage to Carrow Savings Bank encumbers Parcel 9. A subordination, non-disturbance and attornment agreement (SNDA) is required before the lease is recorded. Conservation easement on Parcel 9. A 2009 conservation easement held by the Sallow Creek Land Trust covers 18.2 acres along Sallow Creek and bars structures, roads and utility lines within it. The layout keeps out of the easement, and the collection crossing of Sallow Creek is placed north of it. Neighbor agreements. Northfold has offered good neighbor agreements, with annual payments and screening commitments, to the owners of the 14 non-participating residences closest to the fence. Quote starts. Three have signed. Quote ends. No setback waivers have been requested, because no local or state setback applies to the solar facility. Memoranda of lease will be recorded when each option is exercised, expected before construction financing. Title commitments have been ordered for all parcels; the commitment for Parcels 2, 5 and 9 is in the data room. This summary is not a legal opinion. The recorded instruments and the agreements govern. Northfold land team - privileged and confidential Page 2 of 2

The page

The outline marks where the quote begins on the page.

Page 2 of Option and Lease Summary - Tamsin Ridge Solar and Storage Project

Other claims quoted on this page

  • C-489cabb421

    Parcel 11 lies between the West and East Blocks; the planned collection route and East Block access road cross it.

  • C-61e6db1965

    The Parcel 11 trustee has declined the standard option twice and asked for a purchase price well above appraisal.

  • C-7dce4e6e67

    Without Parcel 11, the collection line would follow Linnet Road right-of-way about 1.3 miles, needing a county right-of-way permit and adding cost.

  • C-ebcacfde9b

    No condemnation power is available to the Project.

  • C-7d33945087

    The lessee's planned second pad on Parcel 2 overlaps about 9 acres of the array layout.

  • C-9099731d6e

    An accommodation agreement with Brenwick is in draft and not signed; until then a lender will see an unsubordinated surface use right.

  • C-579694c789

    A 1912 deed severed Parcel 9 coal and reserved the right to mine it by underground methods without liability for surface damage.

  • C-343e9b9832

    Coal beneath Parcel 9 was largely mined out by the Elsby No. 2 Mine.

  • C-3598318144

    A 2009 conservation easement held by Sallow Creek Land Trust covers 18.2 acres on Parcel 9 and bars structures, roads and utility lines.

  • C-cda362694d

    The layout keeps out of the easement, and the collection crossing of Sallow Creek is placed north of it.

  • C-2a27cb9782

    No setback waivers have been requested because no local or state setback applies to the solar facility.