Skip to content

Visual Resources & Aesthetics

VI-01 · Matrix · Visual Resources & Aesthetics

Rating
2Impacts likely but may be easily resolved
Why
Impact likely
Worst case
Up to3Resource is present, likely difficult to address
Evidence
Reported
Cited claims
12
Requirements
0
Requests
0

Rating

2Impacts likely but may be easily resolved

up to3Resource is present, likely difficult to address

The engine shows this rating as 2-3

The rule

Code computed the rating from the assessor's inputs:

impact_likely=yes -> 2

Set by the rule

Decision
Released
Evidence state
Reported · desktop, consultant or developer record

Worst case

If what is pending at the cut-off went badly, the same rule gives a higher rating.

Scenario

OPSB, responding to opposition on views and requests for 500-foot setbacks and taller screening, requires larger setbacks or more screening near homes and the cemetery, reducing usable area.

Step still pending
OPSB application review and public comment on the landscaping plan
Inputs in the worst case
Extent core · Avoidable partly · Pathway standard · Impact likely yes
The rule on the worst case
worst case: extent=core, avoidable=partly -> 3
Claims that make it plausible
C-87c8ed2e8e, C-0cac55218c, C-76863a3272, C-de59fd4446

Revision

First verdict
weakened
First critique

Category 2 holds. Several specifics (KOP 2, R-6/R-7, 14,600 feet, warranty, 'unscreened') are not in the cited quotes. 'Adjoin' is overstated, avoidable differs between point and worst case, and Carroll County is listed with no local role.

Revised once after the first critique. Rating unchanged.

The five inputs

Comments

23 residences lie within 1,000 feet. Arrays are visible from about 2.1 miles of public roads, mostly within half a mile. At Pettibone Family Cemetery, 120 feet from arrays, they are visible on three sides. Low-potential glare at two residences. Moderate impact for five years, then low. No scenic byway visibility.

Critique

Verdict
upheld
Suggested direction for the rating
same
Summary

Assessment is largely supported. OPSB pathway and the worst case are reasonable. Minor issues: the 'targeted buffer' claim is not in the quote, the signed-agreement link is inferred, and the residence count may include participating homes. Category 2 stands.

Critic model
Luminol

Issues

  1. Severity minor · Kind unsupported_statement

    The extent rationale says the buffer is 'targeted at specific nearby residences rather than the whole perimeter' (C-08ccaab9c2). The quote only recommends a buffer of two staggered rows and says nothing about targeting. The 'peripheral' call needs a KOP or viewshed share to settle it.

    Cites C-08ccaab9c2

  2. Severity minor · Kind unsupported_statement

    'Three have signed' (C-f20a02cd94) does not say what was signed. Linking it to the good neighbor agreements is an inference. The 120-foot cemetery distance is also stated as 'from arrays' where the quote shows only '120 feet'.

    Cites C-f20a02cd94, C-76863a3272

  3. Severity minor · Kind other

    23 residences within 1,000 feet may include participating homes. The assessment treats all of them as sensitive viewers. This does not change the category.

    Cites C-de59fd4446

Checks

  • Passed

    rating_has_evidence · blocking

  • Passed

    presence_is_evidenced · not blocking

  • Passed

    counter_evidence_considered · not blocking

  • Passed

    numbers_grounded · not blocking

  • Passed

    agencies_grounded · not blocking

  • Passed

    cutoff_respected · blocking

  • Passed

    critic_not_refuted · blocking

Evidence (12)

Each claim the row cites: the statement in the assessor's words, then the quote the engine found on the page.

Arrow keys move the selection. A middle-click opens the claim's own page.

  1. A vegetative buffer of two staggered rows of native evergreens and shrubs is recommended along about 14,600 linear feet, including near 14 non-participating residences.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 2Exact
  2. Moderate visual impact is expected during the first five years, falling to low, except at KOP 2 where the BESS yard and substation remain partly visible from R-6 and R-7.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 2Exact
  3. Low-potential (green) glare is predicted at two residences, R-11 and R-14, for 5 to 15 minutes on spring and autumn mornings.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 1Exact
  4. A landscaping plan with species, spacing and a two-year replacement warranty should be part of the OPSB application.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 2Exact
  5. At KOP 4, Pettibone Family Cemetery, 120 feet from arrays, arrays are visible on three sides without screening.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 2Exact
  6. No local zoning, conditional use, variance or site plan approval is required, and no local setback, height or screening standard applies to the proposed facility.Zoning Verification - Tamsin Ridge Solar and Storage Project · Page 1Exact
  7. Opponents raised property values and views, requesting 500-foot setbacks from homes and taller screening.Summary of the County Public Meeting under ORC 303.61 - Tamsin Ridge · Page 1Exact
  8. The viewshed model shows arrays visible from about 2.1 miles of public roads, mostly within half a mile.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 2Exact
  9. There are 23 residences within 1,000 feet of the Project.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 1Exact
  10. Good neighbor agreements with payments and screening were offered to owners of 14 nearby non-participating residences; three have signed.Option and Lease Summary - Tamsin Ridge Solar and Storage Project · Page 2Exact
  11. Northfold will offer good neighbor agreements with screening to the 14 nearest non-participating homes.Summary of the County Public Meeting under ORC 303.61 - Tamsin Ridge · Page 1Exact
  12. The Project is not visible from any designated scenic byway or state scenic river.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 2Exact

Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project

C-08ccaab9c2 · Page 2 of 2 · DR-0015

Open the claim, C-08ccaab9c2

A vegetative buffer of two staggered rows of native evergreens and shrubs is recommended along about 14,600 linear feet, including near 14 non-participating residences.

Quote check Exact · Placed verbatim · The quote occurs on the page exactly as written. · Read as native

Glare, Aviation and Visual Memo - Tamsin Ridge 3. Visual assessment The landscape is rolling farmland with wooded stream valleys. We built a viewshed model from bare-earth terrain and the woodlots and prepared photo simulations from four key observation points (KOPs). KOP Viewpoint Distance to Visibility without screening With screening arrays 1 State Route 43 at Fescue Road 0.3 mile Arrays visible across open fields Mostly screened after 5 years 2 Linnet Road at R-6 and R-7 600 feet Arrays and BESS yard visible Partly screened 3 Fescue Road, west of Parcel 8 250 feet Arrays dominant in the view Screened 4 Pettibone Family Cemetery 120 feet Arrays visible on three sides Screened by buffer planting The viewshed model shows arrays visible from about 2.1 miles of public roads, mostly within half a mile. The Project is not visible from any designated scenic byway or state scenic river. 4. Landscaping and screening plan Quote starts. We recommend a vegetative buffer of two staggered rows of native evergreens and shrubs Quote ends., planted at 5 to 6 feet and reaching 10 to 12 feet within five years, along about 14,600 linear feet: beside the 14 non-participating residences nearest the fence, along the State Route 43 frontage, around the BESS yard and substation, and around the cemetery buffer. A landscaping plan with species, spacing and a two-year replacement warranty should be part of the OPSB application. Agricultural-style fencing (woven wire on wood posts) reduces the industrial look of the perimeter. With the screening, we expect a moderate visual impact during the first five years, falling to low after the plantings mature, except at KOP 2, where the BESS yard and substation remain partly visible from residences R-6 and R-7. Ivo Marchetti, Principal, Parhelion Analytics, LLC. Parhelion Analytics, LLC Page 2 of 2

The outline marks where the quote begins on the page.

Page 2 of Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project
  1. C-08ccaab9c2

    A vegetative buffer of two staggered rows of native evergreens and shrubs is recommended along about 14,600 linear feet, including near 14 non-participating residences.

    Quoted from page 2
    We recommend a vegetative buffer of two staggered rows of native evergreens and shrubs

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 2 · 2023-04-25

    Source consultant_memo · Claim type recommendation · Polarity neutral · Confidence high · Quote check exact, 100 of 100

    Filed under EC-03, VI-01

  2. C-0cac55218c

    Moderate visual impact is expected during the first five years, falling to low, except at KOP 2 where the BESS yard and substation remain partly visible from R-6 and R-7.

    Quoted from page 2
    we expect a moderate visual impact during the first five years, falling to low after the plantings mature

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 2 · 2023-04-25

    Source consultant_memo · Claim type study_finding · Polarity presence · Confidence high · Quote check exact, 100 of 100

  3. C-1a3c29d782

    Low-potential (green) glare is predicted at two residences, R-11 and R-14, for 5 to 15 minutes on spring and autumn mornings.

    Quoted from page 1
    low-potential (green) glare at two residences (R-11 and R-14) for 5 to 15 minutes on spring and autumn mornings.

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 1 · 2023-04-25

    Source desktop_study · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by EN-05 · Filed under EN-05, VI-01

  4. C-29ea880786

    A landscaping plan with species, spacing and a two-year replacement warranty should be part of the OPSB application.

    Quoted from page 2
    should be part of the OPSB application

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 2 · 2023-04-25

    Source consultant_memo · Claim type recommendation · Polarity neutral · Confidence medium · Quote check exact, 100 of 100

    Filed under PE-02, VI-01

  5. C-76863a3272

    At KOP 4, Pettibone Family Cemetery, 120 feet from arrays, arrays are visible on three sides without screening.

    Quoted from page 2
    Pettibone Family Cemetery 120 feet Arrays visible on three sides

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 2 · 2023-04-25

    Source consultant_memo · Claim type presence · Polarity presence · Confidence medium · Quote check exact, 100 of 100

    Cited by CU-01 · Filed under CU-01, VI-01

  6. C-8041623932

    No local zoning, conditional use, variance or site plan approval is required, and no local setback, height or screening standard applies to the proposed facility.

    Quoted from page 1
    No local zoning permit, conditional use permit, variance or site plan approval is therefore required for the proposed facility, and no local setback, height or screening standard applies to it.

    Zoning Verification - Tamsin Ridge Solar and Storage Project · DR-0022 · Page 1 · 2023-02-14

    Source agency_determination · Claim type absence · Polarity absence · Confidence high · Quote check exact, 100 of 100

    Cited by EG-04, PE-01 · Filed under EG-04, PE-01, VI-01

  7. C-87c8ed2e8e

    Opponents raised property values and views, requesting 500-foot setbacks from homes and taller screening.

    Quoted from page 1
    Property values and views, with requests for 500-foot setbacks from homes and taller screening.

    Summary of the County Public Meeting under ORC 303.61 - Tamsin Ridge · DR-0023 · Page 1 · 2023-05-12

    Source developer_document · Claim type stakeholder · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by CO-02, PE-01 · Filed under CO-02, PE-01, VI-01

  8. C-d06343c798

    The viewshed model shows arrays visible from about 2.1 miles of public roads, mostly within half a mile.

    Quoted from page 2
    The viewshed model shows arrays visible from about 2.1 miles of public roads, mostly within half a mile.

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 2 · 2023-04-25

    Source desktop_study · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

  9. C-de59fd4446

    There are 23 residences within 1,000 feet of the Project.

    Quoted from page 1
    the 23 residences within 1,000 feet.

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 1 · 2023-04-25

    Source desktop_study · Claim type presence · Polarity presence · Confidence medium · Quote check exact, 100 of 100

    Cited by CO-02 · Filed under CO-02, VI-01

  10. C-f20a02cd94

    Good neighbor agreements with payments and screening were offered to owners of 14 nearby non-participating residences; three have signed.

    Quoted from page 2
    Three have signed.

    Option and Lease Summary - Tamsin Ridge Solar and Storage Project · DR-0004 · Page 2 · 2023-05-30

    Source developer_document · Claim type stakeholder · Polarity neutral · Confidence medium · Quote check exact, 100 of 100

    Cited by CO-02 · Filed under CO-02, VI-01

  11. C-f615487362

    Northfold will offer good neighbor agreements with screening to the 14 nearest non-participating homes.

    Quoted from page 1
    Offer good neighbor agreements, with screening, to the 14 nearest non-participating homes.

    Summary of the County Public Meeting under ORC 303.61 - Tamsin Ridge · DR-0023 · Page 1 · 2023-05-12

    Source developer_document · Claim type recommendation · Polarity neutral · Confidence high · Quote check exact, 100 of 100

    Cited by CO-02 · Filed under CO-02, VI-01

  12. C-f63db08a1e

    The Project is not visible from any designated scenic byway or state scenic river.

    Quoted from page 2
    The Project is not visible from any designated scenic byway or state scenic river.

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 2 · 2023-04-25

    Source desktop_study · Claim type absence · Polarity absence · Confidence high · Quote check exact, 100 of 100

Requirements and permits

The requirements the assessor tied to this row, by level. Each quote from dated law is shown with its source.

No requirement is tied to this row.

Information requests

No information request for this row.

Next steps

  • Include landscaping plan and vegetative buffer in the OPSB application.
  • Add screening or setback at Pettibone Family Cemetery; run KOP simulations to confirm extent.
  • Continue good neighbor agreements with the 14 nearest non-participating homes.

Agencies

  • OPSB

Cost and impact

Impact
C, S
Potential cost level
L-M
Why

Vegetative buffer plantings and screening offered under good neighbor agreements, with possible added screening at the cemetery. Modest schedule exposure through OPSB application content and public comment.

Impact: C = cost, S = schedule. Potential cost level: L, L-M, M, M-H, H (relative to a utility-scale solar budget).

Lumerian Labs 2026