Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project

C-f63db08a1e · Page 2 of 2 · DR-0015 · 2023-04-25

The claim, in the assessor's words

The Project is not visible from any designated scenic byway or state scenic river.

Quoted from page 2
The Project is not visible from any designated scenic byway or state scenic river.

Source desktop_study · Claim type absence · Polarity absence · Confidence high · Quote check exact, 100 of 100

Cited by VI-01 Visual Resources & Aesthetics · Filed under VI-01

On the page

The page text exactly as the engine read it, with the quote marked.

Placed normalised · The quote matches the page once line breaks, hyphenation, case and punctuation are set aside, as the engine's matcher compares text. The marked words are the page's own.

Read as native

Go to the marked quote

Glare, Aviation and Visual Memo - Tamsin Ridge 3. Visual assessment The landscape is rolling farmland with wooded stream valleys. We built a viewshed model from bare-earth terrain and the woodlots and prepared photo simulations from four key observation points (KOPs). KOP Viewpoint Distance to Visibility without screening With screening arrays 1 State Route 43 at Fescue Road 0.3 mile Arrays visible across open fields Mostly screened after 5 years 2 Linnet Road at R-6 and R-7 600 feet Arrays and BESS yard visible Partly screened 3 Fescue Road, west of Parcel 8 250 feet Arrays dominant in the view Screened 4 Pettibone Family Cemetery 120 feet Arrays visible on three sides Screened by buffer planting The viewshed model shows arrays visible from about 2.1 miles of public roads, mostly within half a mile. Quote starts. The Project is not visible from any designated scenic byway or state scenic river. Quote ends. 4. Landscaping and screening plan We recommend a vegetative buffer of two staggered rows of native evergreens and shrubs, planted at 5 to 6 feet and reaching 10 to 12 feet within five years, along about 14,600 linear feet: beside the 14 non-participating residences nearest the fence, along the State Route 43 frontage, around the BESS yard and substation, and around the cemetery buffer. A landscaping plan with species, spacing and a two-year replacement warranty should be part of the OPSB application. Agricultural-style fencing (woven wire on wood posts) reduces the industrial look of the perimeter. With the screening, we expect a moderate visual impact during the first five years, falling to low after the plantings mature, except at KOP 2, where the BESS yard and substation remain partly visible from residences R-6 and R-7. Ivo Marchetti, Principal, Parhelion Analytics, LLC. Parhelion Analytics, LLC Page 2 of 2

The page

The outline marks where the quote begins on the page.

Page 2 of Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project

Other claims quoted on this page

  • C-76863a3272

    At KOP 4, Pettibone Family Cemetery, 120 feet from arrays, arrays are visible on three sides without screening.

  • C-d06343c798

    The viewshed model shows arrays visible from about 2.1 miles of public roads, mostly within half a mile.

  • C-08ccaab9c2

    A vegetative buffer of two staggered rows of native evergreens and shrubs is recommended along about 14,600 linear feet, including near 14 non-participating residences.

  • C-29ea880786

    A landscaping plan with species, spacing and a two-year replacement warranty should be part of the OPSB application.

  • C-0cac55218c

    Moderate visual impact is expected during the first five years, falling to low, except at KOP 2 where the BESS yard and substation remain partly visible from R-6 and R-7.