1Finding

PE-01 Local Zoning & Permitting

3Resource is present, likely difficult to address

The rule

Code computed the rating from the assessor's inputs:

extent=core, avoidable=partly -> 3

Set by the rule

Decision
Released
Evidence state
VERIFIED · field study or agency determination

The assessor's comments

Parcels are zoned A-1 Agricultural. Special exception is granted by the Board of Zoning Appeals following a public hearing. Ordinance requires a 250-foot setback from non-participating residences and a decommissioning bond before the improvement location permit. Residents along CR 400 N voiced opposition at a township meeting. Moratorium and road use status unconfirmed.

PE-02 State Jurisdiction

2Impacts likely but may be easily resolved

The rule

Code computed the rating from the assessor's inputs:

impact_likely=yes -> 2

Set by the rule

Decision
Released with flags
The engine's reasons
  • Agencies not in the register or the evidence: IURC (conditional)
  • Category 2 is plausible from the applies-level NPDES requirement. The assessment is weakened by inconsistent handling of S-02 (labeled data-room evidenced but described as having no quote), an avoidability call made without delineation evidence, and an extent call that rests on professional judgment.
Evidence state
INFERRED · reasoned from several records

The assessor's comments

No state siting application, agency correspondence, or stormwater permit/SWPPP is included in the data room. Construction stormwater general permit coverage applies. An IDEM 401 WQC/isolated wetland permit is likely if fill or discharge occurs in waters or isolated wetlands. IURC CPCN applicability is unconfirmed.

PE-03 Other

2Impacts likely but may be easily resolved

The rule

Code computed the rating from the assessor's inputs:

impact_likely=yes -> 2

Set by the rule

Decision
Released with flags
The engine's reasons
  • Agencies not in the register or the evidence: EPA, USACE, Transmission line owner (to be identified)
Evidence state
INFERRED · reasoned from several records

The assessor's comments

An existing 138 kV transmission line crosses the eastern portion of the Project Area; crossing or encroachment coordination is likely. Line ownership and terms are not documented. No federal land, funding or permit is documented in the data room. Sugar Run and tributaries are likely jurisdictional waters.

2What the record shows

PE-01 Local Zoning & Permitting

The five inputs

Supporting statements (8)

Each claim the row cites: the statement in the assessor's words, then the quote the engine found on the page.

  1. C-17067c687e

    Several residents along CR 400 N voiced opposition at the April 18 township meeting, mainly about views and property values.

    Quoted from page 1
    Several residents along CR 400 N voiced opposition at the April 18 township meeting, mainly about views and property values.

    Email: RE: Township meeting recap · DR-0010 · Page 1 · 2023-04-19

    Source correspondence · Claim type stakeholder · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by CO-02, VI-01 · Filed under CO-02, VI-01

  2. C-2ad119167d

    The Fixture County Solar Ordinance requires a 250-foot setback from non-participating residences.

    Quoted from page 1
    The Fixture County Solar Ordinance requires a 250-foot setback from non-participating residences

    Fixture County Zoning Verification Letter 2023-04-02 · DR-0007 · Page 1 · 2023-04-02

    Source public_record · Claim type regulatory · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by CO-02, VI-01 · Filed under CO-02, PE-01, VI-01

  3. C-318952bc4a

    The special exception is granted by the Board of Zoning Appeals following a public hearing.

    Quoted from page 1
    granted by the Board of Zoning Appeals following a public hearing.

    Fixture County Zoning Verification Letter 2023-04-02 · DR-0007 · Page 1 · 2023-04-02

    Source agency_determination · Claim type regulatory · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by CO-02 · Filed under CO-02, PE-01

  4. C-81ccc0d11b

    The ordinance requires a decommissioning bond prior to issuance of an improvement location permit.

    Quoted from page 1
    a decommissioning bond prior to issuance of an improvement location permit.

    Fixture County Zoning Verification Letter 2023-04-02 · DR-0007 · Page 1 · 2023-04-02

    Source public_record · Claim type regulatory · Polarity presence · Confidence high · Quote check exact, 100 of 100

  5. C-9219b5c2a9

    A petition with 60 signatures was submitted to the township trustees.

    Quoted from page 1
    A petition with 60 signatures was submitted to the township trustees.

    Email: RE: Township meeting recap · DR-0010 · Page 1 · 2023-04-19

    Source correspondence · Claim type stakeholder · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by CO-02 · Filed under CO-02

  6. C-cd028dc455

    The township trustees did not take any action following the meeting.

    Quoted from page 1
    The trustees did not take any action.

    Email: RE: Township meeting recap · DR-0010 · Page 1 · 2023-04-19

    Source correspondence · Claim type other · Polarity neutral · Confidence high · Quote check exact, 100 of 100

    Cited by CO-02 · Filed under CO-02, PE-01

  7. C-d8361ea2dc

    The subject parcels are zoned A-1 Agricultural.

    Quoted from page 1
    The subject parcels are zoned A-1 Agricultural.

    Fixture County Zoning Verification Letter 2023-04-02 · DR-0007 · Page 1 · 2023-04-02

    Source agency_determination · Claim type regulatory · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by EN-03 · Filed under EN-03, PE-01

  8. C-fd8c52be70

    Residents asked for 500 ft setbacks and vegetative screening along CR 400 N at a township meeting.

    Quoted from page 1
    residents asked for 500 ft setbacks and vegetative screening along CR 400 N.

    meeting notes · DR-0012 · Page 1 · Undated

    Source correspondence · Claim type stakeholder · Polarity presence · Confidence medium · Quote check exact, 100 of 100

    Cited by CO-02, VI-01 · Filed under CO-02, PE-01, VI-01

PE-02 State Jurisdiction

The five inputs

  • Present: yes

    No data-room claims exist for this row. Candidate requirement F-CWA402 (NPDES construction stormwater coverage and SWPPP, applies, PACK_PENDING_QUALIFIED_REVIEW) supports state approvals being required; in Indiana IDEM administers it. S-02 (IDEM 401 WQC/isolated wetland permit, likely, DATA_ROOM_EVIDENCED) is also listed as a candidate requirement, but no quote is provided to support the Sugar Run reference. S-03 is model knowledge only and is not relied on alone.

    Cites no claim.

  • Extent: core

    Construction stormwater coverage applies to every utility-scale project and governs the project as a whole. The disturbed acreage is not documented (1,356 acres is total project area), but the permit still covers the whole project under the common plan of development. This is a professional judgment.

    Cites no claim.

  • Avoidable: yes

    Construction stormwater coverage is a general permit and is routinely obtainable. Any S-02 permit is triggered only by fill or discharge, and siting can avoid that. Ownership and offtake structure are not documented, so IURC CPCN applicability (S-01, unverified, conditional) is unknown and not assumed either way.

    Cites no claim.

  • Pathway: standard

    The established requirement is a general permit (NPDES construction stormwater) with routine IDEM review. No evidence shows a full siting certificate proceeding or a statutory bar. The CPCN question is open and is handled as a next step.

    Cites no claim.

  • Impact likely: yes

    State approvals are required. Stormwater NOI/SWPPP preparation and possible IDEM water quality review add cost and schedule for a typical utility-scale build.

    Cites no claim.

Supporting statements (0)

The row cites no claim.

PE-03 Other

The five inputs

  • Present: yes

    C-fe67965fc1 documents an existing 138 kV transmission line crossing the eastern Project Area, so utility crossing or encroachment coordination is a reasonable expectation for a solar build. F-SPCC is conditional on oil volume above the threshold, which is not documented; SPCC applicability is therefore a possibility, not a documented need. No federal land, funding or permit is documented. C-c601777a50 (likely jurisdictional waters) points to a possible Section 404 nexus, but whether impacts occur is undetermined. L-03 (applies) is a local approval addressed in the local zoning row.

    Cites C-fe67965fc1, C-c601777a50

  • Extent: unknown

    C-fe67965fc1 places the line in the eastern portion but does not show how much of the 1,356-acre site it affects, and no layout is documented. No project-wide federal nexus is documented, so NEPA is not shown to cover the whole project. Extent cannot be established from the evidence.

    Cites C-fe67965fc1

  • Avoidable: yes

    Line ownership and crossing terms are not documented. As a professional judgment, utility crossing agreements and SPCC plans are typically routine, and no evidence of a realistic denial exists. A federal nexus is not documented, so no discretionary approval is shown.

    Cites C-fe67965fc1

  • Pathway: standard

    Judgment: a crossing or encroachment agreement with the line owner (owner undocumented) and a possible SPCC plan follow standard processes. No federal nexus requiring an EA or EIS is documented. A Section 404 nationwide permit tied to C-c601777a50 would also be standard if wetland impacts occur.

    Cites C-fe67965fc1, C-c601777a50

  • Impact likely: yes

    Judgment, not documented layout: collection-line, access road and fence work on a site crossed by an existing 138 kV line will typically need crossing or encroachment coordination (C-fe67965fc1). Likely waters (C-c601777a50) may add a Corps permit check. This adds some coordination time and cost.

    Cites C-fe67965fc1, C-c601777a50

Supporting statements (2)

Each claim the row cites: the statement in the assessor's words, then the quote the engine found on the page.

  1. C-c601777a50

    Sugar Run and its tributaries are likely jurisdictional waters of the United States.

    Quoted from page 2
    Sugar Run and its tributaries are likely jurisdictional waters of the United States.

    Wetland and Stream Delineation Report May2023 · DR-0005 · Page 2 · 2023-05-22

    Source consultant_memo · Claim type presence · Polarity presence · Confidence medium · Quote check exact, 100 of 100

    Cited by AQ-01 · Filed under AQ-01, PE-03

  2. C-fe67965fc1

    An existing 138 kV transmission line crosses the eastern portion of the Project Area.

    Quoted from page 1
    An existing 138 kV transmission line crosses the eastern portion of the Project Area.

    Brook Hollow Project Overview 2023-03-15 · DR-0001 · Page 1 · 2023-03-15

    Source developer_document · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by EN-01 · Filed under EN-01, PE-03

3Permits and requirements

The requirements tied to the rows of this report, by level.

Engine 0.1.0, which made this run, wrote no timelines or citations of law.

Federal (3)

  • NPDES Construction Stormwater General Permit coverage and SWPPP

    F-CWA402 · State NPDES permitting authority (EPA where not delegated)

    Applicability
    Required
    Instrument
    Clean Water Act Section 402 (33 U.S.C. 1342); 40 CFR 122.26
    Trigger
    Construction disturbing one acre or more, or part of a larger common plan of development.
    Description

    Coverage under the construction stormwater general permit with a Stormwater Pollution Prevention Plan for land disturbance of one acre or more.

    Verification
    PACK_PENDING_QUALIFIED_REVIEW
    Source
    pack:federal
    In the permit matrix
    F-CWA402
  • NEPA review (categorical exclusion, environmental assessment or EIS)

    F-NEPA · Lead federal agency

    Applicability
    Conditional
    Instrument
    National Environmental Policy Act (42 U.S.C. 4321 et seq.)
    Trigger
    Federal nexus.
    Description

    Environmental review of major federal actions, such as federal land use, funding, loans or individual federal permits.

    As of the cut-off

    As of the cut-off: Fiscal Responsibility Act amended NEPA. (2023-06-03) Changed after the cut-off (not applied): CEQ's NEPA implementing regulations were rescinded. (2025-04-11)

    Verification
    PACK_PENDING_QUALIFIED_REVIEW
    Source
    pack:federal
    In the permit matrix
    F-NEPA
  • Spill Prevention, Control and Countermeasure (SPCC) Plan

    F-SPCC · U.S. Environmental Protection Agency

    Applicability
    Conditional
    Instrument
    Oil Pollution Prevention, 40 CFR Part 112
    Trigger
    Substation and inverter transformers holding oil above the threshold.
    Description

    Required where aggregate aboveground oil storage capacity exceeds 1,320 gallons (counting containers of 55 gallons or more, including oil-filled transformers) and a discharge could reach navigable waters.

    Verification
    PACK_PENDING_QUALIFIED_REVIEW
    Source
    pack:federal
    In the permit matrix
    F-SPCC

State (9)

  • No state siting certificate for 120 MWac merchant solar (IURC CPCN not required)

    S-01 · Indiana Utility Regulatory Commission (IURC)

    Applicability
    Conditional
    Instrument
    Certificate of Public Convenience and Necessity / siting
    Trigger
    Only if project is utility-owned or the utility seeks IURC approval of PPA/ownership
    Description

    Indiana has no state siting permit for private solar; siting is local. IURC jurisdiction applies only to regulated utilities (IC 8-1-8.5 CPCN for utility-owned generation or PPA approval) and would be triggered only if Prairie Electric owns or seeks approval for the project.

    As of the cut-off

    As of 2023-08-15 Indiana had no state solar siting permit; local control prevails (the 2023 legislative session considered but did not enact a state siting override for solar; IC 36-7-4-1109 on local wind/solar ordinances was later amended in 2024-2025 efforts). Check later changes.

    Verification
    MODEL_KNOWLEDGE_UNVERIFIED
    Source
    model:jurisdiction
    In the permit matrix
    S-01
  • 401 WQC and isolated wetland permit

    S-02 · Indiana Department of Environmental Management (IDEM)

    Applicability
    Likely
    Instrument
    Section 401 Water Quality Certification / State Isolated Wetland permit (IC 13-18-22)
    Trigger
    Fill or discharge in Sugar Run/tributaries or isolated wetlands
    Description

    Sugar Run and tributaries are likely jurisdictional waters, so a 401 WQC is required with any federal Section 404 permit. Isolated state-regulated wetlands and waters not covered federally need an IDEM isolated wetland permit if impacted.

    As of the cut-off

    As of 2023-08-15, after Sackett v. EPA (May 2023), federal jurisdiction narrowed, making state isolated wetland permitting more important. Indiana SEA 389 (2021) deregulated Class I and some Class II isolated wetlands.

    Verification
    DATA_ROOM_EVIDENCED
    Source
    model:jurisdiction
    In the permit matrix
    S-02
  • Notice of Intent and Construction Stormwater Pollution Prevention Plan

    S-03 · IDEM

    Applicability
    Required
    Instrument
    Construction Stormwater General Permit (327 IAC 15-5, Rule 5)
    Trigger
    Land disturbance of 1 acre or more
    Description

    Land disturbance of one acre or more requires Rule 5 NOI submitted to IDEM, with the SWPPP reviewed by the county SWCD or MS4. This project disturbs well over one acre.

    As of the cut-off

    Rule 5 as of 2023-08-15.

    Verification
    MODEL_KNOWLEDGE_UNVERIFIED
    Source
    model:jurisdiction
    In the permit matrix
    S-03
  • Construction in a Floodway permit

    S-04 · Indiana Department of Natural Resources (DNR) Division of Water

    Applicability
    Conditional
    Instrument
    Flood Control Act permit (IC 14-28-1)
    Trigger
    Any work in a mapped floodway or on a stream with 1+ sq mi drainage area
    Description

    Required for construction in a designated floodway of streams with drainage area of 1 square mile or more, e.g. Sugar Run crossings, collection lines, or fencing.

    As of the cut-off

    As of 2023-08-15.

    Verification
    MODEL_KNOWLEDGE_UNVERIFIED
    Source
    model:jurisdiction
    In the permit matrix
    S-04
  • Environmental review request for state endangered and threatened species

    S-05 · Indiana DNR Division of Fish & Wildlife / Nature Preserves; USFWS Bloomington field office

    Applicability
    Likely
    Instrument
    Natural Heritage Database review and state-listed species review (IC 14-31, 312 IAC 9)
    Trigger
    Always for screening; tree clearing and stream work raise risk
    Description

    Request a DNR Environmental Review for state-listed species and natural heritage. Indiana bat and northern long-eared bat tree clearing windows are commonly recommended.

    As of the cut-off

    As of 2023-08-15. NLEB was reclassified as federally endangered effective March 2023.

    Verification
    MODEL_KNOWLEDGE_UNVERIFIED
    Source
    model:jurisdiction
    In the permit matrix
    S-05
  • SHPO review; Section 106 consultation if a federal nexus exists; DNR Archaeology Plan/Permit for state-land or discovered human remains

    S-06 · Indiana DNR Division of Historic Preservation and Archaeology (SHPO)

    Applicability
    Conditional
    Instrument
    IC 14-21-1 Historic Preservation and Archaeology Act, state permit
    Trigger
    Federal nexus (e.g. 404 permit) or discovery of burials/archaeological artifacts
    Description

    No general state review for private land without a state or federal nexus, but SHPO consultation is triggered through federal permits. Inadvertent discovery of human remains or burials requires DNR notification under IC 14-21-1.

    As of the cut-off

    As of 2023-08-15. Federal nexus is missing from the project facts.

    Verification
    MODEL_KNOWLEDGE_UNVERIFIED
    Source
    model:jurisdiction
    In the permit matrix
    S-06
  • INDOT access and utility ROW permits and oversize/overweight load permits

    S-07 · Indiana Department of Transportation (INDOT) and county highway department

    Applicability
    Conditional
    Instrument
    Road/ROW permits, oversize/overweight haul permits
    Trigger
    Access, crossings or hauling on state routes
    Description

    Needed for state-highway driveway access, utility crossings of state ROW, and delivery of heavy equipment such as main power transformers.

    As of the cut-off

    As of 2023-08-15.

    Verification
    MODEL_KNOWLEDGE_UNVERIFIED
    Source
    model:jurisdiction
    In the permit matrix
    S-07
  • Regulated drain crossing/encroachment approval and tile protection

    S-08 · Indiana DNR / county Drainage Board / County Surveyor

    Applicability
    Conditional
    Instrument
    Indiana Drainage Code (IC 36-9-27); regulated drains
    Trigger
    Work within regulated drain easements or disturbing drainage tile
    Description

    Crossings or work near county regulated drains need Drainage Board approval. Agricultural tile disturbed by construction must be repaired.

    As of the cut-off

    As of 2023-08-15.

    Verification
    MODEL_KNOWLEDGE_UNVERIFIED
    Source
    model:jurisdiction
    In the permit matrix
    S-08
  • Construction Design Release for certain structures

    S-09 · Indiana Department of Homeland Security (Fire Prevention and Building Safety Commission)

    Applicability
    Conditional
    Instrument
    Indiana Design Release / electrical code
    Trigger
    Construction of enclosed buildings of qualifying class
    Description

    Applies to qualifying buildings such as O&M or substation control buildings. Not typically needed for solar arrays themselves.

    As of the cut-off

    As of 2023-08-15.

    Verification
    MODEL_KNOWLEDGE_UNVERIFIED
    Source
    model:jurisdiction
    In the permit matrix
    S-09

Local (4)

  • Special exception for commercial solar energy system following public hearing

    L-01 · Fixture County Board of Zoning Appeals

    Applicability
    Required
    Instrument
    Fixture County Solar Ordinance; A-1 zoning; special exception
    Trigger
    Commercial solar in A-1 district
    Description

    Parcels are zoned A-1 Agricultural, where commercial solar is allowed only by special exception from the BZA following a public hearing. Local opposition has been voiced, so the hearing is a key risk.

    As of the cut-off

    Ordinance as shown in the data-room records dated 2023-04-02. Later amendments are not known.

    Verification
    DATA_ROOM_EVIDENCED
    Source
    model:jurisdiction
    In the permit matrix
    L-01
  • Compliance with 250-foot setback from non-participating residences

    L-02 · Fixture County Solar Ordinance

    Applicability
    Required
    Instrument
    Setback and screening standards
    Trigger
    Site layout near non-participating residences, especially along CR 400 N
    Description

    The ordinance requires 250 ft from non-participating residences. Residents asked for 500 ft and screening along CR 400 N, which the BZA could impose as a condition of the special exception, but this request is not part of the ordinance.

    As of the cut-off

    Ordinance as of 2023-04-02. The 500 ft request is undated and non-binding.

    Verification
    DATA_ROOM_EVIDENCED
    Source
    model:jurisdiction
    In the permit matrix
    L-02
  • ILP preceded by decommissioning bond

    L-03 · Fixture County Plan Commission / Building Department

    Applicability
    Required
    Instrument
    Improvement Location Permit (ILP) and decommissioning bond
    Trigger
    Before construction
    Description

    The ordinance requires a decommissioning bond before issuance of the ILP. Building and electrical permits are likely part of the ILP process.

    As of the cut-off

    Ordinance as of 2023-04-02.

    Verification
    DATA_ROOM_EVIDENCED
    Source
    model:jurisdiction
    In the permit matrix
    L-03
  • Local road use agreement and moratorium check (to be confirmed)

    L-04 · Fixture County / township

    Applicability
    To be confirmed
    Instrument
    Road use and maintenance agreement; local moratorium check
    Trigger
    Use of county roads, including CR 400 N, for hauling
    Description

    The data room says nothing about road use agreements or moratoria. The township trustees took no action after the April 2023 meeting, and no moratorium is evidenced.

    As of the cut-off

    As of 2023-08-15 no moratorium is evidenced.

    Verification
    DATA_ROOM_EVIDENCED
    Source
    model:jurisdiction
    In the permit matrix
    L-04

4What is missing

The information requests the run raised for the rows of this report, by priority: what is missing, what follows from it, and whether it holds up the decision.

High priority (1)

  • IR-f2153419ed · High priority

    Provide the permitting plan or schedule for the project area, or confirm none exists.

    Missing evidence
    Permitting plan or schedule
    Consequence
    Local Zoning & Permitting is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness

Medium priority (3)

  • IR-ee6010c685 · Medium priority

    Provide the state siting application, docket record or agency correspondence for the project area, or confirm none exists.

    Missing evidence
    State siting application, docket record or agency correspondence
    Consequence
    State Jurisdiction is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
  • IR-1a7896d177 · Medium priority

    Provide the stormwater permit / swppp for the project area, or confirm none exists.

    Missing evidence
    Stormwater permit / SWPPP
    Consequence
    State Jurisdiction is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
  • IR-09b3f986d4 · Medium priority

    Provide the evidence of federal land, funding or permits for the project area, or confirm none exists.

    Missing evidence
    Evidence of federal land, funding or permits
    Consequence
    Other is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness

5Next steps and agencies

PE-01 Local Zoning & Permitting

Next steps

  • Engage county planning staff early; confirm BZA hearing date, special exception application and decommissioning bond amount.
  • Engage CR 400 N residents; evaluate larger setbacks and vegetative screening.
  • Confirm road use agreement requirements and whether any moratorium applies.

Agencies

  • Fixture County Board of Zoning Appeals
  • Fixture County Solar Ordinance
  • Fixture County Plan Commission / Building Department
  • Fixture County / township

PE-02 State Jurisdiction

Next steps

  • Confirm with IURC whether a CPCN is needed given ownership and offtake structure.
  • Plan IDEM stormwater NOI and SWPPP; 401/isolated wetland permit if fill is unavoidable.
  • Check mapped floodways and drainage areas for DNR floodway permit; submit DNR species screening; review INDOT access/hauling triggers.

Agencies

  • IDEM
  • Indiana DNR
  • IURC (conditional)

PE-03 Other

Next steps

  • Identify line owner and crossing/encroachment terms; overlay line corridor on site layout.
  • Confirm Corps jurisdiction for Sugar Run and any Section 404/Section 106 federal nexus.
  • Check railroad, state route and county road crossings, regulated drains, and SPCC applicability once transformer oil volumes are known.

Agencies

  • EPA
  • USACE
  • Transmission line owner (to be identified)

6Basis and limits

This report is a desk review of the documents quoted above, as the engine read them for an information cut-off of 2023-08-15.

It is not a field survey and not a modelled study: this review made no site visit and ran no acoustic, hydraulic or other model. Where the record is silent, the report says what is missing; it does not fill the gap.

Every statement, figure and quote is the engine's record as written. The headings and connecting words are fixed text of this room, the same in every report.

Documents quoted (5)

Versions and data hashes

As the engine and the exporter recorded them. Hashes are SHA-256.

Information cut-off
2023-08-15
Engine version
0.1.0
Prompt version
2026-10-02.1
Rows pack
rows.json sha256 d1df27b21f79b09d
Federal pack
federal.json sha256 aa17c41356542d46
State pack
none
Local pack
Not written by this engine
Data room manifest
6141b7dc1f8441489d39e4023d551e4c0021a37ce4f9ad157607d9096c58bfb5
Audit chain
valid (92 events)
QA status
PASS
Rendered at
2026-10-01T21:09:12+00:00
Run record (annex)
a03418c2562baa8a57b7c256ce665acd2c20e92d06e365604d162e9029f8fdd6
Exporter
Prism/room/exporter 1.4.0

Prism desk report · engine 0.1.0 · prompts 2026-10-02.1 · information cut-off 2023-08-15

Lumerian Labs 2026