Stormwater, Floodplain and Drainage Memo - Tamsin Ridge Solar and Storage Project

C-1a003c9f9c · Page 3 of 3 · DR-0019 · 2023-06-05

The claim, in the assessor's words

Twelve parcels are enrolled in CAUV and eight are in an agricultural district; recoupment charge and withdrawal penalty may apply unless the energy facility exception applies.

Quoted from page 3
Twelve parcels are enrolled in CAUV and eight are in an agricultural district

Source consultant_memo · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

Cited by EN-03 Agricultural Resources · Filed under EN-03

On the page

The page text exactly as the engine read it, with the quote marked.

Placed normalised · The quote matches the page once line breaks, hyphenation, case and punctuation are set aside, as the engine's matcher compares text. The marked words are the page's own.

Read as native

Go to the marked quote

Stormwater, Floodplain and Drainage Memo - Tamsin Ridge 6. Agricultural drainage Field tile. Landowners report subsurface drain tile in the West Block fields on Parcels 1 to 4, 6 and 8 and on Parcel 14. No tile maps exist. A drain tile locating survey (aerial imagery, probing and test pits) should be done before final design, and tile cut by piles, trenches or roads must be repaired or rerouted so that upstream fields and neighbors keep their drainage. Tile mains should be kept out of the pile rows where possible. County ditch. The Harrison Township No. 4 county ditch crosses Parcel 3 and runs along the southern line of Parcel 5. It is maintained by the county engineer under ORC Chapter 6131, with a maintenance easement within 25 feet of the top of each bank. Fencing, piles and equipment are kept out of that strip, and the collection line crosses the ditch by bore. Any change to the ditch itself would need a petition to the Board of County Commissioners. 7. Farmland The NRCS soil survey (SSURGO) maps about 62 percent of the land as prime farmland and another 21 percent as farmland of statewide importance, mostly Wooster and Canfield silt loams. Quote starts. Twelve parcels are enrolled in CAUV and eight are in an agricultural district Quote ends. (see the parcel schedule), so a recoupment charge and a district withdrawal penalty may apply on conversion unless the energy facility exception applies. The topsoil will be stripped only where grading is needed and restored at decommissioning, and the drain tile repairs will be recorded for the landowners. Anika Tessmer, P.E., Project Engineer, Tessmer Coyle Engineering, Inc. Tessmer Coyle Engineering, Inc. - Job 2317 Page 3 of 3

The page

The outline marks where the quote begins on the page.

Page 3 of Stormwater, Floodplain and Drainage Memo - Tamsin Ridge Solar and Storage Project

Other claims quoted on this page

  • C-c8e5735fc6

    Landowners report subsurface drain tile in the West Block fields on Parcels 1 to 4, 6 and 8 and Parcel 14; no tile maps exist.

  • C-b49803fd5c

    A drain tile locating survey should be done before final design, and tile cut by project work must be repaired or rerouted.

  • C-d07aa54486

    Harrison Township No. 4 county ditch crosses Parcel 3 and runs along the southern line of Parcel 5, with a maintenance easement within 25 feet of each bank top.

  • C-83e349f335

    County ditch has a maintenance easement within 25 feet of the top of each bank; fencing, piles and equipment are kept out.

  • C-dd848d6716

    SSURGO maps about 62 percent of the land as prime farmland and another 21 percent as farmland of statewide importance.