Zoning Verification - Tamsin Ridge Solar and Storage Project
C-2227c77011 · Page 1 of 1 · DR-0022 · 2023-02-14
The claim, in the assessor's words
County floodplain regulations exempt major utility facilities permitted by the Power Siting Board.
They exempt major utility facilities permitted by the Power Siting Board.
Source agency_determination · Claim type regulatory · Polarity absence · Confidence medium · Quote check exact, 100 of 100
Cited by AQ-02 Floodplains · Filed under AQ-02
On the page
The page text exactly as the engine read it, with the quote marked.
Placed verbatim · The quote occurs on the page exactly as written.
Read as native
The page
The outline marks where the quote begins on the page.

Other claims quoted on this page
Carroll County has not adopted a county zoning resolution, and Harrison Township has not adopted a township zoning resolution under ORC Chapter 519.
No local zoning, conditional use, variance or site plan approval is required, and no local setback, height or screening standard applies to the proposed facility.
The facility is understood to be an electric generating plant of more than 50 megawatts needing an Ohio Power Siting Board certificate.
ORC 303.57 to 303.62 give the Board of County Commissioners separate powers over large solar facilities, outside the scope of the letter.