Tamsin Ridge Solar and Storage
This is a fictional demonstration project in which every organisation, person, parcel and finding is invented.
Zoning Verification - Tamsin Ridge Solar and Storage Project
C-09acff9294 · Page 1 of 1 · DR-0022 · 2023-02-14
The claim, in the assessor's words
Carroll County has not adopted a county zoning resolution, and Harrison Township has not adopted a township zoning resolution under ORC Chapter 519.
Carroll County has not adopted a county zoning resolution. Harrison Township has not adopted a township zoning resolution under ORC Chapter 519.
Source agency_determination · Claim type absence · Polarity absence · Confidence high · Quote check exact, 100 of 100
Cited by PE-01 Local Zoning & Permitting, PE-07 Regional Siting Climate · Filed under PE-01, PE-07
On the page
The page text exactly as the engine read it, with the quote marked.
Placed normalised · The quote matches the page once line breaks, hyphenation, case and punctuation are set aside, as the engine's matcher compares text. The marked words are the page's own.
Read as native
The page
The outline marks where the quote begins on the page.

Other claims quoted on this page
No local zoning, conditional use, variance or site plan approval is required, and no local setback, height or screening standard applies to the proposed facility.
The facility is understood to be an electric generating plant of more than 50 megawatts needing an Ohio Power Siting Board certificate.
ORC 303.57 to 303.62 give the Board of County Commissioners separate powers over large solar facilities, outside the scope of the letter.
County floodplain regulations exempt major utility facilities permitted by the Power Siting Board.