Stormwater, Floodplain and Drainage Memo - Tamsin Ridge Solar and Storage Project
C-846e2b0e13 · Page 1 of 3 · DR-0019 · 2023-06-05
The claim, in the assessor's words
Sallow Creek is not on Ohio EPA's impaired waters list and no TMDL applies.
Sallow Creek is not on Ohio EPA's list of impaired waters and no TMDL applies to it.
Source consultant_memo · Claim type absence · Polarity absence · Confidence high · Quote check exact, 100 of 100
Cited by AQ-01 Wetlands and Waterbodies, EG-02 Stormwater · Filed under AQ-01, EG-02
On the page
The page text exactly as the engine read it, with the quote marked.
Placed normalised · The quote matches the page once line breaks, hyphenation, case and punctuation are set aside, as the engine's matcher compares text. The marked words are the page's own.
Read as native
The page
The outline marks where the quote begins on the page.

Other claims quoted on this page
Disturbance over one acre requires Ohio EPA construction stormwater general permit OHC000006 coverage, including an SWP3 and Notice of Intent.
SWP3 covers a fenced area of about 780 acres, of which about 96 acres will be graded.
Post-construction practices must treat the water quality volume (0.90-inch rainfall runoff) because more than two acres will be disturbed.
Ohio EPA's 2022 solar guidance treats panels over well-vegetated pervious surface as disconnected impervious area, provided dense vegetation is kept and runoff is not collected in swales.
Basins have embankments no higher than 6 feet and about 9 acre-feet each, below the size requiring an ODNR dam construction permit.
Soils are mostly hydrologic soil groups C and D, with moderate to high runoff potential.