Standard Flood Hazard Determination - Tamsin Ridge Parcels 5, 9 and 10
C-d0039fd7b9 · Page 1 of 1 · DR-0009 · 2023-03-15
The claim, in the assessor's words
Parcel 9 is in Zone AE with a regulatory floodway along Sallow Creek; the remainder is Zone X.
Zone AE with regulatory floodway along Sallow Creek; remainder Zone X
Source agency_determination · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100
Cited by AQ-02 Floodplains · Filed under AQ-02
On the page
The page text exactly as the engine read it, with the quote marked.
Placed verbatim · The quote occurs on the page exactly as written.
Read as native
The page
The outline marks where the quote begins on the page.

Other claims quoted on this page
Proposed improvements include solar arrays, inverters, collection lines, access roads; Parcel 5 would host a substation and battery storage yard.
No LOMA or LOMR is on file for these parcels.
Parcel 5 is mostly Zone X, with Zone AE along its southern line only, outside the proposed substation and battery yard.
Parcel 10 lies in Zone AE along Sallow Creek; the remainder is Zone X.
The SFHA follows Sallow Creek through the middle of the property.
Approximately 62 acres of the examined parcels lie within Zone AE, including about 21 acres of regulatory floodway.
Buildings or equipment placed in Zone AE would be in the SFHA and subject to county floodplain management regulations, unless exempt.