Standard Flood Hazard Determination - Tamsin Ridge Parcels 5, 9 and 10
C-0caa870c61 · Page 1 of 1 · DR-0009 · 2023-03-15
The claim, in the assessor's words
Proposed improvements include solar arrays, inverters, collection lines, access roads; Parcel 5 would host a substation and battery storage yard.
Proposed improvements: solar arrays, inverters, collection lines, access roads; on Parcel 5 a substation and battery storage yard.
Source consultant_memo · Claim type project_fact · Polarity neutral · Confidence high · Quote check exact, 100 of 100
Cited by EG-04 Battery Storage Fire Safety · Filed under EG-04, EN-01, PE-03
States the fact project.technology = solar PV and battery storage
On the page
The page text exactly as the engine read it, with the quote marked.
Placed normalised · The quote matches the page once line breaks, hyphenation, case and punctuation are set aside, as the engine's matcher compares text. The marked words are the page's own.
Read as native
The page
The outline marks where the quote begins on the page.

Other claims quoted on this page
No LOMA or LOMR is on file for these parcels.
Parcel 5 is mostly Zone X, with Zone AE along its southern line only, outside the proposed substation and battery yard.
Parcel 9 is in Zone AE with a regulatory floodway along Sallow Creek; the remainder is Zone X.
Parcel 10 lies in Zone AE along Sallow Creek; the remainder is Zone X.
The SFHA follows Sallow Creek through the middle of the property.
Approximately 62 acres of the examined parcels lie within Zone AE, including about 21 acres of regulatory floodway.
Buildings or equipment placed in Zone AE would be in the SFHA and subject to county floodplain management regulations, unless exempt.