Noise Assessment - Tamsin Ridge Solar and Storage Project
C-fd52f76b29 · Page 3 of 3 · DR-0016 · 2023-07-10
The claim, in the assessor's words
Blasting is not expected.
Blasting is not expected;
Source consultant_memo · Claim type absence · Polarity absence · Confidence high · Quote check exact, 100 of 100
Cited by EN-02 Geotechnical and Soils, CO-03 Noise · Filed under CO-03, EN-02
On the page
The page text exactly as the engine read it, with the quote marked.
Placed verbatim · The quote occurs on the page exactly as written.
Read as native
The page
The outline marks where the quote begins on the page.

Other claims quoted on this page
Pile driving would reach about 80 to 87 dBA for several days at the nearest non-participating residence, 260 feet from the array fence (R-2).
Recommended construction controls: loud work 7 a.m. to 7 p.m. Monday to Saturday, notice, complaint line, and vibration monitoring within 200 feet of residences or wells.