The claim, in the assessor's words

Cropland covers about 818 acres (72%) of the Project Area, mostly on prime farmland soils.

Quoted from page 2
Cropland (corn, soybeans) 818 72% Mostly prime farmland soils

Source field_study · Claim type extent · Polarity presence · Confidence medium · Quote check exact, 100 of 100

Cited by EC-03 Vegetation and Habitat, EN-03 Agricultural Resources · Filed under EC-03, EN-03

On the page

The page text exactly as the engine read it, with the quote marked.

Placed verbatim · The quote occurs on the page exactly as written.

Read as native

Go to the marked quote

Bat Habitat Assessment and Vegetation Survey - Tamsin Ridge 3. Vegetation and plant communities Cover type Acres (approx.) Share of Project Area Notes Quote starts. Cropland (corn, soybeans) 818 72% Mostly prime farmland soils Quote ends. Hay and pasture 160 14% Cool-season grasses; grassland bird nesting Reclaimed surface-mined grassland 80 7% Autumn olive and multiflora rose invading Forest and woodlots 41 4% Riparian forest; upland woodlots Wetlands, streams, farmsteads, lanes 41 3% See the delineation report No native prairie remnants, rare natural communities or old-growth forest were found. The riparian forest along Sallow Creek is the most valuable vegetation type in the Project Area and is mostly outside the layout. The reclaimed mine grassland is heavily invaded by autumn olive (Elaeagnus umbellata) and multiflora rose; Canada thistle, a state noxious weed, is scattered on field edges. 4. Vegetation management recommendations • Seed the arrays with a low-growing native seed mix with pollinator-friendly flowering species, as ODNR's solar guidance recommends, and keep a vegetation management plan for the life of the Project. • Treat autumn olive and multiflora rose before grading in the East Block, and control noxious weeds under the Ohio noxious weed law. • Limit tree clearing to the 38 acres in the draft layout; avoid the riparian forest and the W-3 wetland stand. • Revegetate disturbed ground within 14 days of final grading, as the stormwater permit requires. Prepared by: Linnea Barrow, PWS, and Jonah Tillery, Wildlife Biologist. Corvane Environmental, Inc. - Project 23-114 Page 2 of 2

The page

The outline marks where the quote begins on the page.

Page 2 of Bat Habitat Assessment and Vegetation Survey - Tamsin Ridge Solar and Storage Project

Other claims quoted on this page

  • C-a6c169a2d9

    About 80 acres (7%) of the Project Area is reclaimed surface-mined grassland.

  • C-100c2c5e80

    No native prairie remnants, rare natural communities or old-growth forest were found.

  • C-08f3573546

    Reclaimed mine grassland is heavily invaded by autumn olive and multiflora rose; Canada thistle, a state noxious weed, is scattered on field edges.

  • C-d756845b5e

    Seed arrays with a low-growing native pollinator-friendly mix and keep a vegetation management plan for the project life.

  • C-b1fad0c404

    Recommendation to avoid the riparian forest and the W-3 wetland stand when limiting tree clearing to 38 acres.