Preliminary Decommissioning Plan and Cost Estimate - Tamsin Ridge Solar and Storage Project
C-b6d40fe4d7 · Page 1 of 2 · DR-0024 · 2023-03-20
The claim, in the assessor's words
Ohio law requires an engineer-prepared decommissioning plan submitted to the OPSB at least 60 days before construction, with removal ending within 12 months of cessation.
the applicant must submit a comprehensive decommissioning plan prepared by a registered professional
Source developer_document · Claim type regulatory · Polarity presence · Confidence medium · Quote check exact, 100 of 100
Cited by PE-06 Decommissioning and Financial Assurance · Filed under PE-02, PE-06
On the page
The page text exactly as the engine read it, with the quote marked.
Placed verbatim · The quote occurs on the page exactly as written.
Read as native
The page
The outline marks where the quote begins on the page.

Other claims quoted on this page
A performance bond with the Board as obligee, equal to the estimate, must be posted before construction, updated every five years and never reduced.
The leases require removal and restoration within 12 months after they end.