Code computed the rating from the assessor's inputs:
extent=core, avoidable=partly -> 3
Set by the rule
Decision
Released
Evidence state
Reported · desktop, consultant or developer record
Worst case
The same rule on the worst case gives no rating above the point.
Scenario
OPSB requires the gross $11.6 million bond with no salvage credit, and the amount is contested through the OPSB process, with landowner security adding further burden.
Step still pending
OPSB review of the decommissioning plan and bond amount
Core inputs, the salvage uncertainty and the worst case are well supported. However, the '60 days before construction' and 'engineer' details appear in no cited quote. The Carroll County agency listing is unsupported, and two uncited claims (C-4e2febbe42, C-640e804855) are not used. Category 3 holds.
Revised once after the first critique. Rating unchanged.
The five inputs
Present: yes
OPSB pre-application summary confirms ORC 4906.21 to 4906.222 decommissioning plan and performance bond requirements apply (C-7818388af6). Lease requires removal to 36 inches and soil restoration (C-00d4067593), with separate security per landowner (C-f3daa0fd5a).
State statute and the bond govern the whole project; leases require removal and restoration across leased land (C-7818388af6, C-0dda429c60, C-e278af1a95). The Parcel 7 collection easement adds removal of above-ground equipment two years after operations stop (C-4e2febbe42).
Terms are front-loaded: a bond equal to the estimate must be posted before construction, updated every five years and never reduced (C-0dda429c60). Whether OPSB accepts the net-of-salvage figure ($5.7M) or requires gross ($11.6M) is unsettled, and salvage values are volatile (C-303a605026, C-7f2ea3298c, C-b508b5b110). Leases also require separate security per landowner (C-f3daa0fd5a).
A decommissioning plan prepared by a registered professional is submitted to OPSB under Ohio law, with a bond and routine five-year updating (C-b6d40fe4d7, C-0dda429c60). The salvage question is an open item, not a documented dispute with the authority (C-7f2ea3298c). Timing details beyond the quoted text are not relied on.
A performance bond must be posted before construction and lease security is required, tying up capital or credit; the plan commits the project to funded removal to 36 inches and restoration (C-0dda429c60, C-00d4067593, C-f3daa0fd5a).
ORC 4906.21 to 4906.222 require a decommissioning plan and performance bond. Bond equal to the estimate is due before construction, updated every five years, never reduced. Estimate is $11.6 million gross, $5.7 million net of salvage; OPSB treatment of salvage is unsettled. Leases require 36-inch removal and separate landowner security.
Critique
Verdict
upheld
Suggested direction for the rating
same
Summary
Assessment is largely supported by the cited claims, and OPSB is the right agency. Two minor problems: the Parcel 7 easement removal term is not in the quote, and the landowner security is framed as additional when the bond is meant to satisfy it.
Critic model
Luminol
Issues
Severity minor · Kind unsupported_statement
The extent rationale cites C-4e2febbe42 for a Parcel 7 easement requiring removal of above-ground equipment two years after operations stop. The quote only says something 'ends two (2) years after it permanently stops operating'. It names no parcel and mentions no removal obligation. Extent 'core' still holds on the other claims.
The worst case says landowner security adds further burden, and the avoidable rationale lists separate security as an extra term. C-f3daa0fd5a says the bond is intended to satisfy the per-landowner security requirement, so it is likely duplicative rather than additional. The next step on aligning lease security with the bond is appropriate.
Lease requires lessee to remove facilities to 36 inches depth and restore soil within 12 months after lease end, with security posted.
Quote check Exact · Placed verbatim · The quote occurs on the page exactly as written. · Read as native
Northfold Energy Partners, LLC
Development office: 88 East Broad Street, Suite 1400, Columbus, Ohio 43215 | northfold-energy.example
Option and Lease Summary
Tamsin Ridge Solar and Storage Project, Harrison Township, Carroll County, Ohio
Prepared by the Northfold land team for Tamsin Ridge Solar, LLC. May 30, 2023.
1. Site control at a glance
Tamsin Ridge Solar, LLC holds option-to-lease agreements on 12 of the 14 parcels (1,063.4 acres) and a
recorded underground collection line easement on Parcel 7 (45.6 acres). Parcel 11 (31.0 acres, Okerlund Family
Trust) is not under agreement. Each option was recorded by a memorandum of option in the Carroll County
Recorder's office.
Term Standard form (all 12 options)
Option period 5 years from execution, with one 3-year extension on notice and payment
Option payments Annual per-acre payment during the option period; credited against rent
Lease term 35 years from the commercial operation date, with two 5-year renewals
Rent Fixed annual rent per fenced acre with a 2% annual escalator; crop damage paid
Use Solar generation, battery storage, substation, collection and gen-tie lines, roads
Lessor reservations Hunting outside the fence; farming of unfenced land; oil and gas rights
Decommissioning Quote starts. Lessee removes all facilities to a depth of 36 inches and restores the soil within 12 months after Quote ends.
the lease ends; lessee posts security
Drain tile Lessee repairs or reroutes tile damaged by construction
Assignment Free assignment to affiliates and lenders; lender protections included
2. Status by landowner
Landowner Parcels Acres Agreement Executed
Varnum Farms LLC 1, 2 215.1 Option to lease Aug. 16, 2021
Jessamy and Corwin Strohl 3, 4 160.6 Option to lease Oct. 4, 2021
Hallorann Land Company LLC 5, 6 165.5 Option to lease Nov. 22, 2021
Delphine Asquith 7 45.6 Collection line easement Recorded Nov. 3,
2022
Bertrand and Ione Kellerman 8 79.8 Option to lease Jan. 18, 2022
Pettibone heirs (Ada Pettibone, trustee) 9, 10 210.0 Option to lease Feb. 7, 2022
Okerlund Family Trust 11 31.0 None; in negotiation -
Marlis Thornbury 12, 13 155.2 Option to lease Mar. 29, 2022
Ruedell Partners LLC 14 77.2 Option to lease June 30, 2022
Northfold land team - privileged and confidential Page 1 of 2
The outline marks where the quote begins on the page.
C-00d4067593
Lease requires lessee to remove facilities to 36 inches depth and restore soil within 12 months after lease end, with security posted.
Quoted from page 1
Lessee removes all facilities to a depth of 36 inches and restores the soil within 12 months after
A performance bond with the Board as obligee, equal to the estimate, must be posted before construction, updated every five years and never reduced.
Quoted from page 1
Before construction it must post a
performance bond, with the Board as obligee, equal to the estimate; the bond is updated every five years and is
never reduced.
The easement ends two years after the project permanently stops operating; grantee must remove above-ground equipment and remove or leave buried cables at grantor's election.
Quoted from page 1
ends two (2) years after it permanently stops operating
Ohio law requires an engineer-prepared decommissioning plan submitted to the OPSB at least 60 days before construction, with removal ending within 12 months of cessation.
Quoted from page 1
the applicant must submit a comprehensive decommissioning plan prepared by a registered professional
The requirements the assessor tied to this row, by level. Each quote from dated law is shown with its source.
No requirement is tied to this row.
Information requests
IR-0a712115cd · High priority
Provide the financial assurance instrument or terms (bond, letter of credit, escrow, parent guarantee) for the project area, or confirm none exists.
Missing evidence
Financial assurance instrument or terms (bond, letter of credit, escrow, parent guarantee)
Consequence
Decommissioning and Financial Assurance is rated on partial evidence without it.
Blocks the decision
No
Raised by
completeness
IR-9c85d7f357 · High priority
Provide the state or local decommissioning rule or permit condition for the project area, or confirm none exists.
Missing evidence
State or local decommissioning rule or permit condition
Consequence
Decommissioning and Financial Assurance is rated on partial evidence without it.
Blocks the decision
No
Raised by
completeness
Next steps
Confirm with OPSB whether the bond may be net of salvage.
Align lease security with the OPSB bond and confirm bond form with the surety or lender.
Include battery removal and recycling in the decommissioning plan and estimate.
Agencies
OPSB
Cost and impact
Impact
C, S
Potential cost level
M-H
Why
Bond sized to the estimate must be posted before construction and never reduced; gross figure of $11.6 million possible versus $5.7 million net; battery removal and recycling must be planned.
Impact: C = cost, S = schedule. Potential cost level: L, L-M, M, M-H, H (relative to a utility-scale solar budget).
Comments
ORC 4906.21 to 4906.222 require a decommissioning plan and performance bond. Bond equal to the estimate is due before construction, updated every five years, never reduced. Estimate is $11.6 million gross, $5.7 million net of salvage; OPSB treatment of salvage is unsettled. Leases require 36-inch removal and separate landowner security.