Preliminary Decommissioning Plan and Cost Estimate - Tamsin Ridge Solar and Storage Project
C-f3daa0fd5a · Page 2 of 2 · DR-0024 · 2023-03-20
The claim, in the assessor's words
The leases require separate security for each landowner, which the bond is intended to satisfy.
The leases require separate security for each landowner, which the bond is intended to satisfy.
Source developer_document · Claim type constraint · Polarity presence · Confidence high · Quote check exact, 100 of 100
Cited by PE-06 Decommissioning and Financial Assurance · Filed under PE-05, PE-06
On the page
The page text exactly as the engine read it, with the quote marked.
Placed normalised · The quote matches the page once line breaks, hyphenation, case and punctuation are set aside, as the engine's matcher compares text. The marked words are the page's own.
Read as native
The page
The outline marks where the quote begins on the page.

Other claims quoted on this page
Decommissioning estimate in 2023 dollars is $11.6 million gross, $5.9 million salvage, $5.7 million net.
Salvage values rely on volatile scrap prices and could fall well short of the estimate.
Whether OPSB accepts the estimate net of salvage ($5.7 million) or requires gross ($11.6 million) has not been settled.