Skip to content

Land Use and Site Features: desk report

Word file

One row of the risk matrix, EN-01 Land Use and Site Features, in the Environmental Resources section: what the record holds on it.

A desk review of the record as it stood: not a field survey and not a modelled study.

Information cut-off
2023-08-01

Downloads

This report as a Word file, and the engine's own files for the whole run.

1Finding

3Resource is present, likely difficult to address

The engine shows this rating as 3

The rule

Code computed the rating from the assessor's inputs:

extent=core, avoidable=partly -> 3

Set by the rule

Decision
Released with flags
The engine's reasons
  • Independent assessments split on the category (7 samples: {'2': 2, '3': 4, '1': 1}); reviewer to confirm
Evidence state
VERIFIED · field study or agency determination

The assessor's comments

Existing 138 kV line crosses the West Block. Gas gathering pipeline crosses Parcels 5, 7 and 10; Parcel 5 also carries an oil and gas lease. Two plugged wells and abandoned mine workings are present. Lessee's planned second pad overlaps about 9 acres of the array layout.

Worst case

The same rule on the worst case gives no rating above the point.

Scenario

The lessee's second pad and pipeline easement rights, with right to add lines, conflict with the array and substation/BESS yard on Parcels 2 and 5, requiring uncertain easement releases or relocation.

Step still pending
Site constraints mapping and negotiations with Brenwick Exploration and Calder Gathering
Inputs in the worst case
Extent core · Avoidable no · Pathway individual · Impact likely yes
The rule on the worst case
worst case (extent=core, avoidable=no -> 3) not above the point
Claims that make it plausible
C-7d33945087, C-dcf3900993, C-f23ef8892f, C-df8aadf77e

2What the record shows

The five inputs

Supporting statements (13)

Each claim the row cites: the statement in the assessor's words, then the quote the engine found on the page.

  1. C-28570f896a

    Structures should be kept at least 100 feet from plugged wells and follow the operator's setbacks from the pad and flowlines.

    Quoted from page 1
    Keep structures at least 100 feet from plugged wells, and follow the operator's setbacks from the pad and its flowlines.

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 1 · 2023-05-15

    Source consultant_memo · Claim type recommendation · Polarity neutral · Confidence high · Quote check exact, 100 of 100

    Cited by EN-02 · Filed under EN-01, EN-02

  2. C-7d33945087

    The lessee's planned second pad on Parcel 2 overlaps about 9 acres of the array layout.

    Quoted from page 2
    The lessee's planned second pad on Parcel 2 overlaps about 9 acres of the

    Option and Lease Summary - Tamsin Ridge Solar and Storage Project · DR-0004 · Page 2 · 2023-05-30

    Source developer_document · Claim type presence · Polarity presence · Confidence low · Quote check exact, 100 of 100

    Cited by PE-05 · Filed under EN-01, EN-02, PE-05

  3. C-a3cebd779c

    Two plugged and abandoned oil and gas wells are within the project area, and an active horizontal Utica well pad adjoins it.

    Quoted from page 1
    two plugged and abandoned oil and gas wells within the project area and an active horizontal Utica well pad adjoining it.

    ODNR Environmental Review - Tamsin Ridge Solar and Storage Project (ODNR 23-0477) · DR-0011 · Page 1 · 2023-05-02

    Source agency_determination · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by EN-02 · Filed under EN-01, EN-02

  4. C-ad2c42da82

    An existing 138 kV transmission line crosses the West Block.

    Quoted from page 1
    An existing 138 kV transmission line crosses the West Block

    Tamsin Ridge Solar and Storage Project - Project Description · DR-0001 · Page 1 · 2023-06-12

    Source developer_document · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

  5. C-af471048ff

    Plugged wells should be surveyed and fenced, keeping setbacks required by the operator and ODNR.

    Quoted from page 1
    Survey and fence the plugged wells and keep the setbacks the operator and ODNR require.

    Phase I Environmental Site Assessment - Tamsin Ridge Solar and Storage Project · DR-0012 · Page 1 · 2023-01-27

    Source consultant_memo · Claim type recommendation · Polarity neutral · Confidence high · Quote check exact, 100 of 100

    Filed under EN-01, EN-02

  6. C-bf7087e782

    A natural gas gathering pipeline crosses Parcels 5, 7 and 10.

    Quoted from page 1
    a natural gas gathering pipeline across Parcels 5, 7 and 10

    Phase I Environmental Site Assessment - Tamsin Ridge Solar and Storage Project · DR-0012 · Page 1 · 2023-01-27

    Source consultant_memo · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Filed under EN-01, PE-05

  7. C-c22072d6dc

    A 100-foot transmission line right-of-way with tree clearing rights affects Parcel 5.

    Quoted from page 2
    a 100-foot right-of-way for a transmission line, with tree clearing rights.

    Commitment for Title Insurance No. ATA-23-0418 (Parcels 2, 5 and 9) · DR-0006 · Page 2 · 2023-04-18

    Source public_record · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Filed under EN-01, PE-05

  8. C-d257ecfe8e

    The easement crosses the Calder Gathering Company natural gas gathering line, requiring the grantee to obtain a written crossing agreement and keep required clearance.

    Quoted from page 1
    Grantee will obtain that company's written crossing agreement and keep the clearance it requires.

    Underground Collection Line Easement Agreement - Parcel 7 · DR-0003 · Page 1 · 2022-11-03

    Source public_record · Claim type constraint · Polarity presence · Confidence medium · Quote check exact, 100 of 100

    Cited by PE-03, PE-05 · Filed under EN-01, PE-03, PE-05

  9. C-d9db0a1832

    Records show abandoned underground Elsby No. 2 Mine beneath the eastern part of the project area, plus pre-1977 reclaimed surface mining.

    Quoted from page 1
    Division records show abandoned underground coal mining, the Elsby No. 2 Mine in the Upper Freeport (No. 7) coal, beneath the eastern part of the project area

    ODNR Environmental Review - Tamsin Ridge Solar and Storage Project (ODNR 23-0477) · DR-0011 · Page 1 · 2023-05-02

    Source agency_determination · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by EN-02 · Filed under EN-01, EN-02

  10. C-dcf3900993

    An oil and gas lease to Brenwick Exploration, with pooled unit, allows surface use for wells, pads, roads, pipelines and tanks on Parcels 2 and 5.

    Quoted from page 2
    surface as is reasonably necessary for wells, pads, roads, pipelines and tanks. Affects Parcels 2 and 5.

    Commitment for Title Insurance No. ATA-23-0418 (Parcels 2, 5 and 9) · DR-0006 · Page 2 · 2023-04-18

    Source public_record · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by PE-05 · Filed under EN-01, EN-02, PE-05

  11. C-df8aadf77e

    Parcel 5 hosts the substation and BESS yard and has a 138 kV line, gathering pipeline and oil and gas lease.

    Quoted from page 1
    Substation, BESS yard; 138 kV line; gathering pipeline; oil and gas lease

    Parcel Schedule 2023-07-14 · DR-0005 · Page 1 · 2023-07-14

    Source developer_document · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by EN-04 · Filed under EN-01, PE-05

  12. C-e9a687c1a0

    Aerial photos and records show farming since at least 1939 and no industrial use found.

    Quoted from page 2
    No industrial use was found.

    Phase I Environmental Site Assessment - Tamsin Ridge Solar and Storage Project · DR-0012 · Page 2 · 2023-01-27

    Source desktop_study · Claim type absence · Polarity absence · Confidence high · Quote check exact, 100 of 100

    Filed under EN-01, EN-04

  13. C-f23ef8892f

    A 50-foot permanent gas gathering pipeline easement to Calder Gathering, with right to add lines, affects Parcel 5.

    Quoted from page 2
    a 50-foot permanent easement for natural gas gathering lines, with the right to

    Commitment for Title Insurance No. ATA-23-0418 (Parcels 2, 5 and 9) · DR-0006 · Page 2 · 2023-04-18

    Source public_record · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Filed under EN-01, PE-05

3Permits and requirements

The requirements tied to the rows of this report, by level. Each quote from dated law is shown with its source, the version in force on the cut-off and the basis for it.

No requirement is tied to the rows of this report.

4What is missing

The information requests the run raised for the rows of this report, by priority: what is missing, what follows from it, and whether it holds up the decision.

High priority (1)

  • IR-e8a82effe6 · High priority

    Provide the site layout or constraints map for the project area, or confirm none exists.

    Missing evidence
    Site layout or constraints map
    Consequence
    Land Use and Site Features is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness

5Next steps and agencies

Next steps

  • Prepare site constraints map from title and ODNR data.
  • Negotiate crossing agreements and surface-use accommodation with Calder Gathering and Brenwick.
  • Site layout to apply well and pipeline setbacks.

Agencies

  • ODNR
  • Carroll County

6Basis and limits

This report is a desk review of the documents quoted above, as the engine read them for an information cut-off of 2023-08-01.

It is not a field survey and not a modelled study: this review made no site visit and ran no acoustic, hydraulic or other model. Where the record is silent, the report says what is missing; it does not fill the gap.

Every statement, figure and quote is the engine's record as written. The headings and connecting words are fixed text of this room, the same in every report.

Versions and data hashes

As the engine and the exporter recorded them. Hashes are SHA-256.

Information cut-off
2023-08-01
Engine version
2.11.0
Prompt version
2026-11-08.1
Rows pack
rows.json sha256 a018ecd7e4703bc1
Federal pack
federal.json sha256 8841c555ff35d20b
State pack
oh.json sha256 d4780705e1f18d09
Local pack
oh_carroll_county.json sha256 905cd3308848e7e8
Data room manifest
0c7e80d0ad17d1e3ed4060b9702e5b1905060ae2896e9aad796a57b590005832
Audit chain
valid (19 events)
QA status
PASS_WITH_WARNINGS
Rendered at
2026-11-10T15:42:40+00:00
Run record (annex)
66fca2c4c0bfa90df1e8efb79c0d2f426536b41f50a6a9b6869dd85e4554fd50
Exporter
Prism/room/exporter 1.4.0

Prism desk report · engine 2.11.0 · prompts 2026-11-08.1 · information cut-off 2023-08-01

Lumerian Labs 2026