Protected Lands and Recreation: desk report
One row of the risk matrix, EN-07 Protected Lands and Recreation, in the Environmental Resources section: what the record holds on it.
A desk review of the record as it stood: not a field survey and not a modelled study.
- Information cut-off
- 2023-08-01
- Row in the matrix
- EN-07 Protected Lands and Recreation
Downloads
This report as a Word file, and the engine's own files for the whole run.
- This reporttamsin-ridge-solar-and-storage-EN-07.docx · Word · 41 KB
- The engine's risk matrixRiskMatrix_TamsinRidgeSolarandStorage.xlsx · Excel · 108 KB
- The engine's permit matrixTamsin Ridge Solar and Storage Permit Matrix.docx · Word · 61 KB
1Finding
Resource is present within area, impact unlikely
up toResource is present, likely difficult to address
The engine shows this rating as 1-3
- The rule
Code computed the rating from the assessor's inputs:
present, impact unlikely -> 1
Set by the rule
- Decision
- Released with flags
- The engine's reasons
- Agencies not in the register or the evidence: Sallow Creek Land Trust
- Category 1 is reasonable and the hedging is good. But the easement holder, the 2009 date and the Parcel 9 and title-scope details do not appear in any cited quote. Those details need supporting quotes.
- Evidence state
- REPORTED · desktop, consultant or developer record
The assessor's comments
Lease summary reports a 2009 conservation easement held by Sallow Creek Land Trust, 18.2 acres along Sallow Creek on Parcel 9, barring structures, roads and utility lines. Developer states the layout keeps out of it, with the collection crossing north. Easement text not reviewed. No protected-area screen or recreation review is in the data room.
Worst case
If what is pending at the cut-off went badly, the same rule gives a higher rating.
- Scenario
Final design needs the Sallow Creek collection line or an access road to cross the easement, requiring a land trust amendment given its bar on roads and utility lines.
- Step still pending
- Final design and easement review, plus title work on the unreviewed parcels
- Inputs in the worst case
- Extent peripheral · Avoidable partly · Pathway individual · Impact likely yes
- The rule on the worst case
- worst case: pathway=individual -> 3
- Claims that make it plausible
- C-32c26a48fd, C-cda362694d, C-3598318144
2What the record shows
The five inputs
Present: yes
The title commitment describes a conservation easement over 18.2 acres along Sallow Creek (C-32c26a48fd). The parcel schedule lists an 18.2-acre conservation easement on Parcel 9 (C-3860d7d158). The lease summary attributes it to Sallow Creek Land Trust and a 2009 grant (C-3598318144).
Cites C-32c26a48fd, C-3860d7d158, C-3598318144
Extent: peripheral
The easement covers 18.2 acres on Parcel 9, one of 14 parcels in a 1,140-acre project. The developer's lease summary states the layout keeps out of it (C-cda362694d), so it lies outside the buildable area on the developer's account. The title commitment's document title covers only Parcels 2, 5 and 9, so easements on other parcels are not addressed.
Cites C-32c26a48fd, C-3860d7d158, C-cda362694d
Avoidable: yes
The lease summary states the layout keeps out of the easement and the Sallow Creek collection crossing is placed north of it (C-cda362694d). This is a developer statement, not verified against a final layout or the recorded easement text.
Cites C-cda362694d
Pathway: none
If the easement is avoided as the developer states (C-cda362694d), no consent, amendment or authorization is needed, since the easement bars structures, roads and utility lines (C-3598318144). The easement terms, any buffer or access rights have not been reviewed. No protected-area screen is in the data room, so any other protected land or rule is unaddressed.
Cites C-cda362694d, C-3598318144
Impact likely: no
Per the developer, arrays, roads and the collection line stay off the easement, which bars structures, roads, utility lines and fill (C-32c26a48fd, C-cda362694d). The area is to remain in natural riparian cover (C-828699d893).
Cites C-32c26a48fd, C-cda362694d, C-828699d893
Supporting statements (5)
Each claim the row cites: the statement in the assessor's words, then the quote the engine found on the page.
C-32c26a48fd
A conservation easement to Sallow Creek Land Trust covers 18.2 acres along Sallow Creek on Parcel 9, barring structures, roads, utility lines or fill.
Quoted from page 2 over 18.2 acres along Sallow Creek. No structures, roads, utility lines or fill are permitted in the
Commitment for Title Insurance No. ATA-23-0418 (Parcels 2, 5 and 9) · DR-0006 · Page 2 · 2023-04-18
Source public_record · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100
C-3598318144
A 2009 conservation easement held by Sallow Creek Land Trust covers 18.2 acres on Parcel 9 and bars structures, roads and utility lines.
Quoted from page 2 covers 18.2 acres along Sallow Creek and bars structures, roads and utility lines within it.
Option and Lease Summary - Tamsin Ridge Solar and Storage Project · DR-0004 · Page 2 · 2023-05-30
Source developer_document · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100
C-3860d7d158
Parcel 9 is undermined, has coal reserved in 1912, an 18.2-acre conservation easement and a mortgage.
Quoted from page 1 Undermined; coal reserved 1912; conservation easement 18.2 ac; mortgage
Parcel Schedule 2023-07-14 · DR-0005 · Page 1 · 2023-07-14
Source developer_document · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100
C-828699d893
The conservation easement area along Sallow Creek on Parcel 9 is to remain in natural riparian cover.
Quoted from page 2 which is to remain in natural riparian cover.
Commitment for Title Insurance No. ATA-23-0418 (Parcels 2, 5 and 9) · DR-0006 · Page 2 · 2023-04-18
Source public_record · Claim type presence · Polarity presence · Confidence medium · Quote check exact, 100 of 100
C-cda362694d
The layout keeps out of the easement, and the collection crossing of Sallow Creek is placed north of it.
Quoted from page 2 The layout keeps out of the easement, and the collection crossing of Sallow Creek is placed north of it.
Option and Lease Summary - Tamsin Ridge Solar and Storage Project · DR-0004 · Page 2 · 2023-05-30
Source developer_document · Claim type constraint · Polarity neutral · Confidence medium · Quote check exact, 100 of 100
3Permits and requirements
The requirements tied to the rows of this report, by level. Each quote from dated law is shown with its source, the version in force on the cut-off and the basis for it.
No requirement is tied to the rows of this report.
4What is missing
The information requests the run raised for the rows of this report, by priority: what is missing, what follows from it, and whether it holds up the decision.
Low priority (3)
IR-cc073e636d · Low priority
Provide the protected-area database screen or protected lands map (national, state and local layers) for the project area, or confirm none exists.
- Missing evidence
- Protected-area database screen or protected lands map (national, state and local layers)
- Consequence
- Protected Lands and Recreation is rated on partial evidence without it.
- Blocks the decision
- No
- Raised by
- completeness
IR-612eae23b5 · Low priority
Provide the land-management or recreation agency correspondence (park, refuge, forest, trail or scenic river managing body) for the project area, or confirm none exists.
- Missing evidence
- Land-management or recreation agency correspondence (park, refuge, forest, trail or scenic river managing body)
- Consequence
- Protected Lands and Recreation is rated on partial evidence without it.
- Blocks the decision
- No
- Raised by
- completeness
IR-d0e0b554ec · Low priority
Provide the recreation and hunting area review for the project area, or confirm none exists.
- Missing evidence
- Recreation and hunting area review
- Consequence
- Protected Lands and Recreation is rated on partial evidence without it.
- Blocks the decision
- No
- Raised by
- completeness
5Next steps and agencies
Next steps
- Obtain the recorded easement and keep the layout and Sallow Creek crossing outside it; confirm terms with the land trust.
- Extend title and easement search to the remaining parcels.
- Run a protected-area and recreation screen with a one-mile buffer.
Agencies
- Sallow Creek Land Trust
6Basis and limits
This report is a desk review of the documents quoted above, as the engine read them for an information cut-off of 2023-08-01.
It is not a field survey and not a modelled study: this review made no site visit and ran no acoustic, hydraulic or other model. Where the record is silent, the report says what is missing; it does not fill the gap.
Every statement, figure and quote is the engine's record as written. The headings and connecting words are fixed text of this room, the same in every report.
Documents quoted (3)
- Commitment for Title Insurance No. ATA-23-0418 (Parcels 2, 5 and 9) · DR-0006 · 2023-04-18 · page 2
- Option and Lease Summary - Tamsin Ridge Solar and Storage Project · DR-0004 · 2023-05-30 · page 2
- Parcel Schedule 2023-07-14 · DR-0005 · 2023-07-14 · page 1
Versions and data hashes
As the engine and the exporter recorded them. Hashes are SHA-256.
- Information cut-off
- 2023-08-01
- Engine version
- 2.11.0
- Prompt version
- 2026-11-08.1
- Rows pack
- rows.json sha256 a018ecd7e4703bc1
- Federal pack
- federal.json sha256 8841c555ff35d20b
- State pack
- oh.json sha256 d4780705e1f18d09
- Local pack
- oh_carroll_county.json sha256 905cd3308848e7e8
- Data room manifest
- 0c7e80d0ad17d1e3ed4060b9702e5b1905060ae2896e9aad796a57b590005832
- Audit chain
- valid (19 events)
- QA status
- PASS_WITH_WARNINGS
- Rendered at
- 2026-11-10T15:42:40+00:00
- Run record (annex)
- 66fca2c4c0bfa90df1e8efb79c0d2f426536b41f50a6a9b6869dd85e4554fd50
- Exporter
- Prism/room/exporter 1.4.0
Prism desk report · engine 2.11.0 · prompts 2026-11-08.1 · information cut-off 2023-08-01