Aviation, Glare and Communications

EN-05 · Matrix · Environmental Resources

Rating
1Resource is present within area, impact unlikely
Why
Present; impact unlikely
Worst case
Up to2Impacts likely but may be easily resolved
Evidence
Reported
Cited claims
11
Requirements
2
Requests
0

Rating

1Resource is present within area, impact unlikely

up to2Impacts likely but may be easily resolved

The engine shows this rating as 1-2

The rule

Code computed the rating from the assessor's inputs:

present, impact unlikely -> 1

Set by the rule

Decision
Released
Evidence state
Reported · desktop, consultant or developer record

Worst case

If what is pending at the cut-off went badly, the same rule gives a higher rating.

Scenario

Final layout or tilt changes raise glare at residences R-11 and R-14, requiring vegetative screening or module adjustments.

Step still pending
Updated glare analysis on the final layout
Inputs in the worst case
Extent peripheral · Avoidable yes · Pathway standard · Impact likely yes
The rule on the worst case
worst case: impact_likely=yes -> 2
Claims that make it plausible
C-1a3c29d782, C-3a488792dd

Revision

Not revised.

The five inputs

Comments

Nearest public-use airport (TSO) is about 5 miles southeast. Structures are over 20,000 feet from the runway and under 200 feet, so no FAA Form 7460-1 notice is required. Low-potential (green) glare predicted at two residences and a short segment of Linnet Road; no glare at TSO approaches.

Critique

Verdict
upheld
Suggested direction for the rating
same
Summary

Assessment is well supported by the cited quotes. Category 1 follows from low-potential green glare, no Part 77 notice, and no airspace penetration. Only minor wording issues: the unsupported "glare study complete" line and unclear agency roles.

Critic model
Luminol

Issues

  1. Severity minor · Kind unsupported_statement

    The pathway rationale says "The glare study is already complete." No cited quote says this. The glare findings come from DR-0015, but that document's completeness or scope is not stated. Cite the study or soften the wording.

    Cites C-1a3c29d782, C-06d00931f7

  2. Severity minor · Kind other

    The pathway is "none", but the agencies list FAA and OPSB. The OPSB role is that the Ohio Office of Aviation consults it, and the project's certificate status is not evidenced. The worst case uses "pathway standard" without naming the step. Clarify the agencies' roles.

    Cites C-8022ac270d

Checks

  • Passed

    rating_has_evidence · blocking

  • Passed

    presence_is_evidenced · not blocking

  • Passed

    counter_evidence_considered · not blocking

  • Passed

    numbers_grounded · not blocking

  • Passed

    agencies_grounded · not blocking

  • Passed

    cutoff_respected · blocking

  • Passed

    critic_not_refuted · blocking

Evidence (11)

Each claim the row cites: the statement in the assessor's words, then the quote the engine found on the page.

Arrow keys move the selection. A middle-click opens the claim's own page.

  1. No yellow or red glare is predicted at any receptor.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 1Exact
  2. Low-potential (green) glare is predicted at two residences, R-11 and R-14, for 5 to 15 minutes on spring and autumn mornings.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 1Exact
  3. The nearest public-use airport, Carroll County-Tolson Airport (TSO), is about 5 miles southeast of the Project.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 1Exact
  4. Low-potential (green) glare under 10 minutes on a few days a year is predicted on a short segment of Linnet Road; none on SR 43 or Fescue Road.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 1Exact
  5. No private airstrip or heliport is within 3 miles of the Project.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 1Exact
  6. No military operations area or radar installation is nearby.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 1Exact
  7. All structures are over 20,000 feet from the nearest runway and none exceeds 200 feet, so no FAA Form 7460-1 notice is required.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 1Exact
  8. No protected airport surface is penetrated by the proposed structures.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 1Exact
  9. Glare modeling predicts no glare at the TSO runway approach paths.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 1Exact
  10. The ODOT Office of Aviation permit does not apply to a facility certificated by the OPSB.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 1Exact
  11. An FCC licensing records search found no licensed microwave beam path across the Project Area.Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · Page 1Exact

Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project

C-06d00931f7 · Page 1 of 2 · DR-0015

Open the claim, C-06d00931f7

No yellow or red glare is predicted at any receptor.

Quote check Exact · Placed verbatim · The quote occurs on the page exactly as written. · Read as native

Parhelion Analytics, LLC Glare, aviation and visual studies for energy projects | Cleveland, Ohio Glare, Aviation and Visual Memo To: Northfold Energy Partners, LLC. From: Parhelion Analytics. April 25, 2023. Re: Tamsin Ridge Solar and Storage Project, Carroll County, Ohio. 1. Airports and airspace The nearest public-use airport is Carroll County-Tolson Airport (TSO), about 5 miles southeast of the Project. No private airstrip or heliport is within 3 miles. The tallest proposed structures are the gen-tie poles (up to 85 feet), the substation dead-end structures (65 feet) and the lightning masts (70 feet); modules on trackers are under 12 feet. We screened the structures against the FAA notice criteria of 14 CFR Part 77 (Section 77.9). Every structure is more than 20,000 feet from the nearest runway and none exceeds 200 feet above ground, so no FAA Form 7460-1 notice is required. The Ohio Department of Transportation Office of Aviation permit does not apply to a facility certificated by the OPSB, and no protected airport surface is penetrated in any case. Microwave and radar. A search of FCC licensing records found no licensed microwave beam path across the Project Area. No military operations area or radar installation is nearby. 2. Glare analysis Glare was modeled with the Solar Glare Hazard Analysis Tool (SGHAT) method for single-axis trackers with backtracking and a 60-degree maximum tilt, using the draft layout. Receptors: the two runway approach paths at TSO, 18 observation points on State Route 43, Linnet Road and Fescue Road, and the 23 residences within 1,000 feet. • TSO approaches: no glare predicted. • Roads: no glare predicted for drivers on State Route 43 or Fescue Road; low-potential (green) glare for under 10 minutes on a few days a year on a short segment of Linnet Road. • Residences: low-potential (green) glare at two residences (R-11 and R-14) for 5 to 15 minutes on spring and autumn mornings. Quote starts. No yellow or red glare at any receptor. Quote ends. The glare at R-11 and R-14 disappears behind the screening plantings proposed below once they reach about 8 feet in height. Parhelion Analytics, LLC Page 1 of 2

The outline marks where the quote begins on the page.

Page 1 of Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project
  1. C-06d00931f7

    No yellow or red glare is predicted at any receptor.

    Quoted from page 1
    No yellow or red glare at any receptor.

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 1 · 2023-04-25

    Source desktop_study · Claim type absence · Polarity absence · Confidence high · Quote check exact, 100 of 100

  2. C-1a3c29d782

    Low-potential (green) glare is predicted at two residences, R-11 and R-14, for 5 to 15 minutes on spring and autumn mornings.

    Quoted from page 1
    low-potential (green) glare at two residences (R-11 and R-14) for 5 to 15 minutes on spring and autumn mornings.

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 1 · 2023-04-25

    Source desktop_study · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by VI-01 · Filed under EN-05, VI-01

  3. C-22ecd9258b

    The nearest public-use airport, Carroll County-Tolson Airport (TSO), is about 5 miles southeast of the Project.

    Quoted from page 1
    The nearest public-use airport is Carroll County-Tolson Airport (TSO), about 5 miles southeast of the Project.

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 1 · 2023-04-25

    Source consultant_memo · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

  4. C-3a488792dd

    Low-potential (green) glare under 10 minutes on a few days a year is predicted on a short segment of Linnet Road; none on SR 43 or Fescue Road.

    Quoted from page 1
    low-potential (green) glare for under 10 minutes on a few days a year on a short segment of Linnet Road.

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 1 · 2023-04-25

    Source desktop_study · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

  5. C-47b8505413

    No private airstrip or heliport is within 3 miles of the Project.

    Quoted from page 1
    No private airstrip or heliport is within 3 miles.

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 1 · 2023-04-25

    Source consultant_memo · Claim type absence · Polarity absence · Confidence high · Quote check exact, 100 of 100

  6. C-4c304fc268

    No military operations area or radar installation is nearby.

    Quoted from page 1
    No military operations area or radar installation is nearby.

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 1 · 2023-04-25

    Source consultant_memo · Claim type absence · Polarity absence · Confidence high · Quote check exact, 100 of 100

    Filed under EN-05, EN-09

  7. C-698d47b3cd

    All structures are over 20,000 feet from the nearest runway and none exceeds 200 feet, so no FAA Form 7460-1 notice is required.

    Quoted from page 1
    Every structure is more than 20,000 feet from the nearest runway and none exceeds 200 feet above ground, so no FAA Form 7460-1 notice is required.

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 1 · 2023-04-25

    Source consultant_memo · Claim type absence · Polarity absence · Confidence high · Quote check exact, 100 of 100

  8. C-7ae4ad619f

    No protected airport surface is penetrated by the proposed structures.

    Quoted from page 1
    no protected airport surface is penetrated in any case.

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 1 · 2023-04-25

    Source consultant_memo · Claim type absence · Polarity absence · Confidence medium · Quote check exact, 100 of 100

  9. C-7fb4ed5f9f

    Glare modeling predicts no glare at the TSO runway approach paths.

    Quoted from page 1
    TSO approaches: no glare predicted.

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 1 · 2023-04-25

    Source desktop_study · Claim type absence · Polarity absence · Confidence high · Quote check exact, 100 of 100

  10. C-8022ac270d

    The ODOT Office of Aviation permit does not apply to a facility certificated by the OPSB.

    Quoted from page 1
    The Ohio Department of Transportation Office of Aviation permit does not apply to a facility certificated by the OPSB

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 1 · 2023-04-25

    Source consultant_memo · Claim type regulatory · Polarity neutral · Confidence medium · Quote check exact, 100 of 100

    Filed under EN-05, PE-02

  11. C-cf1066cd5b

    An FCC licensing records search found no licensed microwave beam path across the Project Area.

    Quoted from page 1
    A search of FCC licensing records found no licensed microwave beam path across the Project Area.

    Glare, Aviation and Visual Memo - Tamsin Ridge Solar and Storage Project · DR-0015 · Page 1 · 2023-04-25

    Source desktop_study · Claim type absence · Polarity absence · Confidence high · Quote check exact, 100 of 100

    Filed under EN-05, EN-09

Requirements and permits

The requirements the assessor tied to this row, by level. Each quote from dated law is shown with its source.

Federal

  • Form 7460-1 Notice of Proposed Construction or Alteration

    F-FAA77 · Federal Aviation Administration

    Applicability
    Conditional
    Instrument
    14 CFR Part 77
    Trigger
    Structures or cranes meeting notice criteria near airports or over 200 feet above ground.
    Description

    Notice for construction that meets Part 77 notice criteria (for example structures over 200 feet, or within defined distances and slopes of public-use airports). FAA's 2021 glare policy covers solar on federally obligated airports, not off-airport projects.

    Typical timeline

    Notice on Form 7460-1 at least 45 days before the start date of construction or the date a construction-permit application is filed, whichever is earliest (14 CFR 77.7(b)); Part 77 sets no FAA decision deadline. A Determination of No Hazard expires 18 months after its effective date unless extended (14 CFR 77.33(b)). Typical: 2 to 4 months for an FAA aeronautical study determination (basis: practice, not stated in the sources).

    As of the cut-off

    As of the cut-off: FAA published its interim policy on solar energy systems at federally obligated airports (78 FR 63276). (2013-10-23) FAA's policy on solar energy system projects at federally obligated airports took effect (86 FR 25801), replacing the 2013 interim policy; it covers on-airport systems at towered airports. (2021-05-11)

    Verification
    PACK_PENDING_QUALIFIED_REVIEW
    Source
    pack:federal
    In the permit matrix
    F-FAA77
    Legal basis: 4 quotes from dated law
    Quoted from the law, page 1
    If requested by the FAA, or if you propose any of the following types of construction or alteration, you must file notice with the FAA of: (a) Any construction or alteration that is more than 200 ft. AGL at its site. (b) Any construction or alteration that exceeds an imaginary surface extending outward and upward

    Source 14CFR77 · page 1 · version 2023-08-01

    Cited for requirement and trigger

    In force from 2016-12-30 to 2026-10-07

    eCFR versioner: 14 CFR part 77, same text on 2021-10-15, 2022-05-20, 2022-09-12, 2023-04-22, 2023-08-01 and on every amendment date between them; amendment dates 2016-12-30

    May be cited on the cut-off date.

    Quoted from the law, page 1
    a completed FAA Form 7460-1, Notice of Proposed Construction or Alteration. FAA Form 7460-1 is available at FAA regional offices and on the Internet. (b) You must submit this form at least 45 days before the start date of the proposed construction or alteration or the date an application for a construction permit is filed, whichever is earliest.

    Source 14CFR77 · page 1 · version 2023-08-01

    Cited for requirement (Form 7460-1) and timeline: 45-day notice

    In force from 2016-12-30 to 2026-10-07

    eCFR versioner: 14 CFR part 77, same text on 2021-10-15, 2022-05-20, 2022-09-12, 2023-04-22, 2023-08-01 and on every amendment date between them; amendment dates 2016-12-30

    May be cited on the cut-off date.

    Quoted from the law, page 1
    Unless extended, revised, or terminated, each Determination of No Hazard to Air Navigation issued under this subpart expires 18 months after the effective date of the determination, or on the date the proposed construction or alteration is abandoned, whichever is earlier.

    Source 14CFR77 · page 1 · version 2023-08-01

    Cited for timeline: validity of a determination

    In force from 2016-12-30 to 2026-10-07

    eCFR versioner: 14 CFR part 77, same text on 2021-10-15, 2022-05-20, 2022-09-12, 2023-04-22, 2023-08-01 and on every amendment date between them; amendment dates 2016-12-30

    May be cited on the cut-off date.

    Quoted from the law, page 1
    The policy applies to proposed on-airport solar energy systems at federally-obligated towered

    Source 86FR25801 · page 1 · version 2021-05-11

    May be cited on the cut-off date.

State

  • ODOT Office of Aviation permit for a structure that may obstruct air navigation near an airport; not required for a facility holding an OPSB certificate, which is reviewed through the OPSB process

    OH-AIRPORT · Ohio Department of Transportation (ODOT), Office of Aviation (permit); Ohio Power Siting Board (OPSB) (certificated facilities, after consulting the Office of Aviation)

    Applicability
    Conditional
    Instrument
    ORC 4561.30 to 4561.39 (Ohio Airport Protection Act); ORC 4561.341; ORC 4906.10(A)(5)
    Trigger
    A structure or object of natural growth that will penetrate, or is reasonably expected to penetrate, a protected surface of an airport open to the public, for a project that has not received an OPSB certificate.
    Description

    No person may begin to install a structure or object of natural growth, any part of which will or is reasonably expected to penetrate an airport's clear zone, horizontal, conical, primary, approach or transitional surface, without an ODOT permit. "Airport" means one certified for commercial purposes by ODOT; ODOT's guidance applies the permit to airports open to the public, and a filed FAA Form 7460-1 meets the state application requirement. ODOT grants or denies the permit by deciding whether the height and location would obstruct air navigation. A person who receives an OPSB certificate is not required to apply. Instead, if the Office of Aviation finds an obstruction, it gives the OPSB that determination in writing with either the conditions needed to remove it or a statement that compliance may be waived, and the OPSB must consult the Office.

    Typical timeline

    File not less than thirty days nor more than two years before the planned start of installation; the department may waive this period for unforeseen emergencies (ORC 4561.33(B)).

    Version of the law on the cut-off
    As in force from 2022-07-28 (the library text)
    Verification
    PACK_PENDING_QUALIFIED_REVIEW
    Source
    pack:oh.json
    In the permit matrix
    OH-AIRPORT
    Legal basis: 8 quotes from dated law
    Quoted from the law, page 2
    no person shall commence to install any structure or object of natural growth in this state, any part of which will penetrate or is reasonably expected to penetrate into or through any airport's clear zone surface, horizontal surface, conical surface, primary surface, approach surface, or transitional surface without first obtaining a permit from the department of transportation

    Source ORC 4561.30 to 4561.39 airport obstructions · page 2 · version 2023-08-01

    In force from 2004-01-01 to 2026-10-03, section 4561.31

    4561.31: version effective 2004-01-01, still the current version when the page map was checked (2026-10-03)

    May be cited on the cut-off date.

    Quoted from the law, page 3
    Any person who receives a certificate from the power siting board pursuant to section 4906.03 or 4906.10 of the Revised Code on or after October 15, 1991, is not required to apply for a permit from the department under sections 4561.30 to 4561.39 of the Revised Code.

    Source ORC 4561.30 to 4561.39 airport obstructions · page 3 · version 2023-08-01

    In force from 2004-01-01 to 2026-10-03, section 4561.31

    4561.31: version effective 2004-01-01, still the current version when the page map was checked (2026-10-03)

    May be cited on the cut-off date.

    Quoted from the law, page 1
    "Airport" means any airport certified for commercial purposes by the department of transportation. "Airport" does not include a military airport owned by the United States government and used for no commercial purposes.

    Source ORC 4561.30 to 4561.39 airport obstructions · page 1 · version 2023-08-01

    In force from 1991-10-15 to 2026-10-03, section 4561.30

    4561.30: version effective 1991-10-15, still the current version when the page map was checked (2026-10-03)

    May be cited on the cut-off date.

    Quoted from the law, page 6
    An applicant shall file an application not less than thirty days nor more than two years prior to the planned date of commencement of installation or substantial change. This period may be waived by the department for unforeseen emergencies.

    Source ORC 4561.30 to 4561.39 airport obstructions · page 6 · version 2023-08-01

    In force from 1991-10-15 to 2026-10-03, section 4561.33

    4561.33: version effective 1991-10-15, still the current version when the page map was checked (2026-10-03)

    May be cited on the cut-off date.

    Quoted from the law, page 8
    In determining whether to grant or deny a permit, the department shall determine whether the height and location of a structure or object of natural growth, as set forth in the permit application, will be an obstruction to air navigation based upon the rules adopted under section 4561.32 of the Revised Code if installed as proposed.

    Source ORC 4561.30 to 4561.39 airport obstructions · page 8 · version 2023-08-01

    In force from 1991-10-15 to 2026-10-03, section 4561.34

    4561.34: version effective 1991-10-15, still the current version when the page map was checked (2026-10-03)

    May be cited on the cut-off date.

    Quoted from the law, page 14
    if the office determines that the facility constitutes or will constitute an obstruction to air navigation, it shall provide, in writing, this determination and either the terms, conditions, and modifications that are necessary for the applicant to eliminate the obstruction or a statement that compliance with the obstruction standards may be waived, to the power siting board

    Source ORC 4561.30 to 4561.39 airport obstructions · page 14 · version 2023-08-01

    In force from 1999-06-30 to 2026-10-03, section 4561.341

    4561.341: version effective 1999-06-30, still the current version when the page map was checked (2026-10-03)

    May be cited on the cut-off date.

    Quoted from the law, page 17
    determining whether the facility will comply with all rules and standards adopted under section 4561.32 of the Revised Code, the board shall consult with the office of aviation of the division of multi-modal planning and programs of the department of transportation under section 4561.341 of the Revised Code.

    Source ORC 4906 Power Siting Board · page 17 · version 2023-08-01

    In force from 2021-10-11 to 2025-08-13, section 4906.10

    4906.10: version effective 2021-10-11; first change after it 2025-08-14 (Am. Sub. H.B. 15, 136th GA), from codes.ohio.gov version history in archive captures (confirmed_two_sources)

    May be cited on the cut-off date.

    Quoted from the law, page 1
    Additionally, a permit from the Ohio Department of Transportation's Office of Aviation must be obtained prior to the start of any construction on or near airports in Ohio that are open to the public. Filing the 7460-1 with the FAA above fulfills the state permit application requirements as set forth in the Ohio Administrative Code, Section 5501:1.

    Source ODOT Office of Aviation airport protection act page · page 1 · version 2022-07-28

    May be cited on the cut-off date.

Information requests

No information request for this row.

Next steps

  • Re-run glare analysis if the layout or module tilt changes.
  • Confirm no FAA notice is needed against final structure heights and crane use.

Agencies

  • FAA
  • OPSB

Cost and impact

Impact
None given.
Potential cost level
N/A
Why

No notice, permit or redesign is required, so no material cost or schedule exposure is identified.

Impact: C = cost, S = schedule. Potential cost level: L, L-M, M, M-H, H (relative to a utility-scale solar budget).