Civil Engineering

EG-01 · Matrix · Engineering Resources

Rating
2Impacts likely but may be easily resolved
Why
Impact likely
Worst case
Up to3Resource is present, likely difficult to address
Evidence
Verified
Cited claims
11
Requirements
0
Requests
2

Rating

2Impacts likely but may be easily resolved

up to3Resource is present, likely difficult to address

The engine shows this rating as 2-3

The rule

Code computed the rating from the assessor's inputs:

impact_likely=yes -> 2

Set by the rule

Decision
Released with flags
The engine's reasons
  • Agencies not in the register or the evidence: Ohio EPA, USACE, Carroll County, Harrison Township Trustees
  • The core evidence supports presence, peripheral extent and category 2. Problems: an unsourced 15–25 percent grading band, Fescue Road haul-route content that belongs in EG-03, avoidable labelled 'yes' when the rationale describes mitigation, and an unsupported link between the NWP 14 quote and the S-4 access road.
Evidence state
Verified · field study or agency determination

Worst case

If what is pending at the cut-off went badly, the same rule gives a higher rating.

Scenario

Refusal, seen in 30 percent of test piles so far, proves widespread beyond the West Block ridges, requiring non-standard pre-drilling or rock excavation across much of the site.

Step still pending
Topographic survey and further pile load testing during final design
Inputs in the worst case
Extent core · Avoidable partly · Pathway standard · Impact likely yes
The rule on the worst case
worst case: extent=core, avoidable=partly -> 3
Claims that make it plausible
C-e04f4cf7e1, C-b3cb8c76ac

Revision

First verdict
weakened
First critique

Inputs largely follow the evidence and the category looks right. Problems: an unsupported 25 percent slope threshold, 'perched' groundwater not in the quote, incomplete agencies (township, floodplain administrator, USACE), missing floodplain and road-use next steps, and a loosely grounded worst case.

Revised once after the first critique. Rating unchanged.

The five inputs

Comments

Slopes reach 18 percent in the East Block and Sallow Creek valley walls. 9 of 30 test piles met refusal before 8 feet, mostly on West Block ridges. Soils show moderate corrosivity; groundwater may be near the surface in the floodplain. About 14 acres of array rows lie in the flood fringe. Fescue Road needs temporary widening.

Critique

Verdict
weakened
Suggested direction for the rating
same
Summary

The core evidence supports presence, peripheral extent and category 2. Problems: an unsourced 15–25 percent grading band, Fescue Road haul-route content that belongs in EG-03, avoidable labelled 'yes' when the rationale describes mitigation, and an unsupported link between the NWP 14 quote and the S-4 access road.

Critic model
Luminol

Issues

  1. Severity major · Kind unsupported_statement

    The extent rationale cites a '15 to 25 percent grading-cost band' and a 25 percent 'row guidance' unbuildable threshold. Neither appears in any cited quote, the row definition, or the requirements considered. The 18 percent figure is supported, but the band is not. Remove it or source it.

    Cites C-b3cb8c76ac

  2. Severity minor · Kind other

    Fescue Road temporary widening and township road-use terms are haul-route and public-road matters. The row definition assigns these to EG-03. Using them as an impact driver and next step double counts and pulls in Harrison Township Trustees as an agency.

    Cites C-8172eb7213

  3. Severity minor · Kind overstatement

    Avoidable is 'yes', but the rationale lists mitigations (pre-drilling, corrosion allowance, drainage design), not avoidance. Slopes, refusal and flood-fringe rows remain on site. 'Partly' fits better, as the worst case implies. The label does not change the category.

    Cites C-e04f4cf7e1, C-d1c044dc6c

  4. Severity minor · Kind unsupported_statement

    'S-4 access road crossing' ties the NWP 14 quote to the access road. The quote only mentions an ephemeral channel of about 40 linear feet. It does not say which crossing or road. Confirm the link in the data room.

    Cites C-336bf30d1a

Checks

  • Passed

    rating_has_evidence · blocking

  • Passed

    presence_is_evidenced · not blocking

  • Passed

    counter_evidence_considered · not blocking

  • Passed

    numbers_grounded · not blocking

  • Failed

    agencies_grounded · not blocking

    Agencies not in the register or the evidence: Ohio EPA, USACE, Carroll County, Harrison Township Trustees

  • Passed

    cutoff_respected · blocking

  • Passed

    critic_not_refuted · blocking

  • Failed

    critic_weakened · not blocking

    The core evidence supports presence, peripheral extent and category 2. Problems: an unsourced 15–25 percent grading band, Fescue Road haul-route content that belongs in EG-03, avoidable labelled 'yes' when the rationale describes mitigation, and an unsupported link between the NWP 14 quote and the S-4 access road.

Evidence (11)

Each claim the row cites: the statement in the assessor's words, then the quote the engine found on the page.

Arrow keys move the selection. A middle-click opens the claim's own page.

  1. Free water was met at 6 to 14 feet in 9 borings, mostly perched near Sallow Creek; seasonal high groundwater may be near the surface in the floodplain.Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · Page 1Exact
  2. The S-4 access road crossing is the only planned fill: about 40 linear feet of ephemeral channel (0.02 acre) under NWP 14.Wetland and Stream Delineation Report - Tamsin Ridge Solar and Storage Project · Page 3Exact
  3. Sallow Creek floodplain has soft alluvial soils to 5 ft and is outside the layout.Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · Page 2Exact
  4. SWP3 covers a fenced area of about 780 acres, of which about 96 acres will be graded.Stormwater, Floodplain and Drainage Memo - Tamsin Ridge Solar and Storage Project · Page 1Exact
  5. About 14 acres of array rows are in the flood fringe on Parcels 9 and 10.Stormwater, Floodplain and Drainage Memo - Tamsin Ridge Solar and Storage Project · Page 2Exact
  6. Soils are mostly hydrologic soil groups C and D, with moderate to high runoff potential.Stormwater, Floodplain and Drainage Memo - Tamsin Ridge Solar and Storage Project · Page 1Exact
  7. Fescue Road is a narrow 16-foot township road with two 90-degree turns needing temporary widening for tractor-trailers.Traffic and Access Memo - Tamsin Ridge Solar and Storage Project · Page 1Exact
  8. Slopes are 0 to 8 percent in the West Block and up to 18 percent in the East Block and Sallow Creek valley walls.Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · Page 1Exact
  9. ODNR maps show the abandoned Elsby No. 2 underground coal mine beneath approximately 165 acres of the East Block (Parcels 9, 10 and 12).Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · Page 1Exact
  10. Resistivity of 1,800 to 3,500 ohm-cm and pH 5.1 to 5.8 indicate moderate corrosivity to buried steel; sulfate exposure is negligible.Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · Page 1Exact
  11. Weathered shale and sandstone met at 4 to 11 feet; 9 of 30 test piles (30 percent) met refusal before 8 feet embedment, mostly on West Block ridges.Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · Page 1Exact

Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project

C-05146fd25c · Page 1 of 3 · DR-0018

Open the claim, C-05146fd25c

Free water was met at 6 to 14 feet in 9 borings, mostly perched near Sallow Creek; seasonal high groundwater may be near the surface in the floodplain.

Quote check Exact · Placed verbatim · The quote occurs on the page exactly as written. · Read as native

Graywacke Geotechnical, LLC Geotechnical engineering and subsurface exploration | Canton, Ohio Preliminary Geotechnical Engineering Report Tamsin Ridge Solar and Storage Project, Harrison Township, Carroll County, Ohio Prepared for Northfold Energy Partners, LLC. Project G23-0219. May 15, 2023. Summary of findings Graywacke drilled 24 borings (B-1 to B-24) across the approximately 1,140-acre Project Area, four of them (B-17 to B-20) to 100 feet in the East Block to investigate mining, and drove and load-tested 30 test piles (TP-1 to TP-30) from March 27 to April 14, 2023. 1. Abandoned underground mine. ODNR Division of Mineral Resources Management abandoned underground mine maps show the Elsby No. 2 Mine, worked in the Upper Freeport (No. 7) coal from about 1915 to 1938 by room-and-pillar methods, beneath approximately 165 acres of the East Block (Parcels 9, 10 and 12). Cover over the coal ranges from 45 to 95 feet. Borings B-17 and B-19 dropped through voids and collapsed rubble at 61 and 74 feet. Two closed depressions, 12 and 20 feet across, on Parcel 10 are mine subsidence features (sinkholes). Pillar failure can continue for decades; sinkhole-type subsidence is most likely where cover is under about 100 feet, which is the case over the whole undermined area. This is the main geotechnical constraint on the Project. 2. Oil and gas wells. Two plugged and abandoned oil and gas wells (Parcels 4 and 10) and an active horizontal Utica well pad adjoining Parcel 5 were located. Keep structures at least 100 feet from plugged wells, and follow the operator's setbacks from the pad and its flowlines. 3. Shallow bedrock and pile refusal. Weathered shale and sandstone were met at 4 to 11 feet. Nine of the 30 test piles (30 percent) met refusal before reaching 8 feet of embedment, mostly on the West Block ridges. Pre-drilling should be assumed for about 30 percent of pile locations. 4. Groundwater. Free water was met at 6 to 14 feet in 9 borings, mostly perched on shale near Sallow Creek. Quote starts. Seasonal high groundwater may be near the surface in the floodplain. Quote ends. 5. Corrosivity. Field resistivity of 1,800 to 3,500 ohm-cm and soil pH of 5.1 to 5.8 indicate moderate corrosivity to buried steel; sulfate exposure is negligible. 6. Slopes. Ground slopes are 0 to 8 percent in the West Block and up to 18 percent in the East Block and on the Sallow Creek valley walls, where colluvium overlies shale. Slope stability is adequate for arrays if cuts on the valley walls are avoided; one small landslide scar was seen on Parcel 12. 7. Design parameters. Frost depth 36 inches. Seismic site class C; seismic hazard is low. Design loads follow ASCE 7-16: basic wind speed 115 mph (Risk Category II), ground snow load 20 psf, and 0.5-inch radial ice for the gen-tie structures. Graywacke Geotechnical, LLC - Project G23-0219 Page 1 of 3

The outline marks where the quote begins on the page.

Page 1 of Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project
  1. C-05146fd25c

    Free water was met at 6 to 14 feet in 9 borings, mostly perched near Sallow Creek; seasonal high groundwater may be near the surface in the floodplain.

    Quoted from page 1
    Seasonal high groundwater may be near the surface in the floodplain.

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 1 · 2023-05-15

    Source field_study · Claim type presence · Polarity presence · Confidence medium · Quote check exact, 100 of 100

    Cited by EN-08 · Filed under EG-01, EN-08

  2. C-336bf30d1a

    The S-4 access road crossing is the only planned fill: about 40 linear feet of ephemeral channel (0.02 acre) under NWP 14.

    Quoted from page 3
    about 40 linear feet of ephemeral channel (0.02 acre), within NWP 14 without pre-construction notification.

    Wetland and Stream Delineation Report - Tamsin Ridge Solar and Storage Project · DR-0013 · Page 3 · 2023-05-22

    Source consultant_memo · Claim type extent · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by AQ-01, PE-03 · Filed under AQ-01, EG-01, PE-03

  3. C-39dffbad33

    Sallow Creek floodplain has soft alluvial soils to 5 ft and is outside the layout.

    Quoted from page 2
    Soft to 5 ft; outside layout

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 2 · 2023-05-15

    Source field_study · Claim type study_finding · Polarity neutral · Confidence medium · Quote check exact, 100 of 100

    Filed under AQ-02, EG-01

  4. C-4c4d92f167

    SWP3 covers a fenced area of about 780 acres, of which about 96 acres will be graded.

    Quoted from page 1
    The SWP3 will cover the fenced area of about 780 acres, of which about 96 acres will be graded;

    Stormwater, Floodplain and Drainage Memo - Tamsin Ridge Solar and Storage Project · DR-0019 · Page 1 · 2023-06-05

    Source consultant_memo · Claim type extent · Polarity neutral · Confidence high · Quote check exact, 100 of 100

    Cited by EG-02 · Filed under EG-01, EG-02

  5. C-546dd83365

    About 14 acres of array rows are in the flood fringe on Parcels 9 and 10.

    Quoted from page 2
    About 14 acres of array rows are in the flood fringe (Zone AE outside the floodway) on Parcels 9 and 10,

    Stormwater, Floodplain and Drainage Memo - Tamsin Ridge Solar and Storage Project · DR-0019 · Page 2 · 2023-06-05

    Source consultant_memo · Claim type extent · Polarity presence · Confidence medium · Quote check exact, 100 of 100

    Cited by AQ-02 · Filed under AQ-02, EG-01

  6. C-55cbc4b507

    Soils are mostly hydrologic soil groups C and D, with moderate to high runoff potential.

    Quoted from page 1
    Soils are mostly hydrologic soil groups C and D (slow infiltration), so runoff potential is moderate to high.

    Stormwater, Floodplain and Drainage Memo - Tamsin Ridge Solar and Storage Project · DR-0019 · Page 1 · 2023-06-05

    Source consultant_memo · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by EG-02 · Filed under EG-01, EG-02

  7. C-8172eb7213

    Fescue Road is a narrow 16-foot township road with two 90-degree turns needing temporary widening for tractor-trailers.

    Quoted from page 1
    Fescue Road is a 16-foot chip-and-seal township road with narrow shoulders and two 90-degree turns where swept path analysis shows that tractor-trailers need temporary widening.

    Traffic and Access Memo - Tamsin Ridge Solar and Storage Project · DR-0020 · Page 1 · 2023-06-19

    Source consultant_memo · Claim type constraint · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by EG-03 · Filed under EG-01, EG-03

  8. C-b3cb8c76ac

    Slopes are 0 to 8 percent in the West Block and up to 18 percent in the East Block and Sallow Creek valley walls.

    Quoted from page 1
    Ground slopes are 0 to 8 percent in the West Block and up to 18 percent in the East Block and on the Sallow Creek valley walls

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 1 · 2023-05-15

    Source field_study · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

  9. C-d106c90db2

    ODNR maps show the abandoned Elsby No. 2 underground coal mine beneath approximately 165 acres of the East Block (Parcels 9, 10 and 12).

    Quoted from page 1
    beneath approximately 165 acres of the East Block (Parcels 9, 10 and 12)

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 1 · 2023-05-15

    Source consultant_memo · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by EN-02 · Filed under EG-01, EN-02

  10. C-d1c044dc6c

    Resistivity of 1,800 to 3,500 ohm-cm and pH 5.1 to 5.8 indicate moderate corrosivity to buried steel; sulfate exposure is negligible.

    Quoted from page 1
    indicate moderate corrosivity to buried steel; sulfate exposure is negligible.

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 1 · 2023-05-15

    Source field_study · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

  11. C-e04f4cf7e1

    Weathered shale and sandstone met at 4 to 11 feet; 9 of 30 test piles (30 percent) met refusal before 8 feet embedment, mostly on West Block ridges.

    Quoted from page 1
    Nine of the 30 test piles (30 percent) met refusal before reaching 8 feet of embedment, mostly on the West Block ridges.

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 1 · 2023-05-15

    Source field_study · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

Requirements and permits

The requirements the assessor tied to this row, by level. Each quote from dated law is shown with its source.

No requirement is tied to this row.

Information requests

  • IR-29617d468a · Medium priority

    Provide the civil design, grading plan or topographic survey for the project area, or confirm none exists.

    Missing evidence
    Civil design, grading plan or topographic survey
    Consequence
    Civil Engineering is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness
  • IR-295dde238b · Medium priority

    Provide the desktop terrain and soil engineering data (dem slope, soil survey) for the project area, or confirm none exists.

    Missing evidence
    Desktop terrain and soil engineering data (DEM slope, soil survey)
    Consequence
    Civil Engineering is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness

Next steps

  • Complete topographic survey and grading design limiting grading on steeper East Block slopes; run more pile tests on West Block ridges.
  • Obtain floodplain development review for Zone AE array rows, or shift rows out.
  • Agree road-use and widening terms for Fescue Road with the township; confirm NWP 14 crossing with USACE.

Agencies

  • Ohio EPA
  • USACE
  • Carroll County
  • Harrison Township Trustees

Cost and impact

Impact
C, S
Potential cost level
L-M
Why

Pre-drilling for refusal, grading on steeper slopes, corrosion allowance and road widening add moderate cost; conditions are not site-wide.

Impact: C = cost, S = schedule. Potential cost level: L, L-M, M, M-H, H (relative to a utility-scale solar budget).