Skip to content

Geotechnical and Soils: desk report

Word file

One row of the risk matrix, EN-02 Geotechnical and Soils, in the Environmental Resources section: what the record holds on it.

A desk review of the record as it stood: not a field survey and not a modelled study.

Information cut-off
2023-08-01

Downloads

This report as a Word file, and the engine's own files for the whole run.

1Finding

2Impacts likely but may be easily resolved

up to3Resource is present, likely difficult to address

The engine shows this rating as 2-3

The rule

Code computed the rating from the assessor's inputs:

impact_likely=yes -> 2

Set by the rule

Decision
Released with flags
The engine's reasons
  • Agencies not in the register or the evidence: OPSB
Evidence state
VERIFIED · field study or agency determination

The assessor's comments

Abandoned Elsby No. 2 underground mine lies beneath approximately 165 acres of the East Block; borings hit voids and two mine-subsidence sinkholes are on Parcel 10. Geotechnical consultant rates further sinkhole probability high over shallow workings. Two plugged wells on site; seismic hazard is low.

Worst case

If what is pending at the cut-off went badly, the same rule gives a higher rating.

Scenario

Investigation finds void-prone shallow-cover ground more widespread than the mapped 165 acres, removing a larger share of the buildable area or requiring extensive grouting.

Step still pending
Detailed mine-void investigation
Inputs in the worst case
Extent core · Avoidable partly · Pathway standard · Impact likely yes
The rule on the worst case
worst case: extent=core, avoidable=partly -> 3
Claims that make it plausible
C-324cdd0ed0, C-e538cf508c, C-d106c90db2, C-1efb994b8f

2What the record shows

The five inputs

Supporting statements (21)

Each claim the row cites: the statement in the assessor's words, then the quote the engine found on the page.

  1. C-03c910d4d1

    ODNR comments on wildlife, wetlands and mines are typically made conditions of the certificate.

    Quoted from page 2
    ODNR comments on wildlife, wetlands and mines are typically made conditions of the certificate.

    OPSB Pre-Application Conference Summary - Tamsin Ridge Solar and Storage Project · DR-0026 · Page 2 · 2023-03-28

    Source agency_determination · Claim type agency_position · Polarity neutral · Confidence high · Quote check exact, 100 of 100

    Cited by EC-01 · Filed under AQ-01, EC-01, EN-02, PE-02

  2. C-1efb994b8f

    Grouting of shallow workings typically costs several million dollars and takes 4 to 8 months; option (b) still leaves residual risk.

    Quoted from page 3
    Grouting of shallow workings typically costs several million dollars for an area of this size and takes 4 to 8 months.

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 3 · 2023-05-15

    Source consultant_memo · Claim type cost · Polarity presence · Confidence high · Quote check exact, 100 of 100

  3. C-28570f896a

    Structures should be kept at least 100 feet from plugged wells and follow the operator's setbacks from the pad and flowlines.

    Quoted from page 1
    Keep structures at least 100 feet from plugged wells, and follow the operator's setbacks from the pad and its flowlines.

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 1 · 2023-05-15

    Source consultant_memo · Claim type recommendation · Polarity neutral · Confidence high · Quote check exact, 100 of 100

    Cited by EN-01 · Filed under EN-01, EN-02

  4. C-2a9ce2a49f

    Two plugged and abandoned oil and gas wells (Parcels 4 and 10) and an active horizontal Utica well pad adjoining Parcel 5 were located.

    Quoted from page 1
    Two plugged and abandoned oil and gas wells (Parcels 4 and 10) and an active horizontal Utica well pad adjoining Parcel 5 were located.

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 1 · 2023-05-15

    Source field_study · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

  5. C-2b0121cadd

    One small landslide scar was seen on Parcel 12.

    Quoted from page 1
    one small landslide scar was seen on Parcel 12.

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 1 · 2023-05-15

    Source field_study · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

  6. C-324cdd0ed0

    Sinkhole-type subsidence is most likely where cover is under about 100 feet, which applies over the whole undermined area; this is the main geotechnical constraint.

    Quoted from page 1
    This is the main geotechnical constraint on the Project.

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 1 · 2023-05-15

    Source consultant_memo · Claim type study_finding · Polarity presence · Confidence high · Quote check exact, 100 of 100

  7. C-440f326a24

    Hydric soil indicators were present in all five delineated wetlands.

    Quoted from page 2
    Hydric soil indicators (depleted matrix, redox dark surface) were present in all five wetlands.

    Wetland and Stream Delineation Report - Tamsin Ridge Solar and Storage Project · DR-0013 · Page 2 · 2023-05-22

    Source field_study · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Filed under AQ-01, EN-02

  8. C-44efda80b8

    Northfold will keep the undermined area out of the layout unless the mine investigation shows it is safe.

    Quoted from page 1
    Keep the undermined area out of the layout unless the mine investigation shows it is safe.

    Summary of the County Public Meeting under ORC 303.61 - Tamsin Ridge · DR-0023 · Page 1 · 2023-05-12

    Source developer_document · Claim type recommendation · Polarity presence · Confidence high · Quote check exact, 100 of 100

  9. C-560f40e113

    Seismic site class C; seismic hazard is low.

    Quoted from page 1
    Seismic site class C; seismic hazard is low.

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 1 · 2023-05-15

    Source consultant_memo · Claim type absence · Polarity absence · Confidence high · Quote check exact, 100 of 100

    Cited by EN-08 · Filed under EN-02, EN-08

  10. C-5c5e675182

    Graywacke considers the probability of further sinkholes over the operating life to be high over the shallow workings; the mine map is incomplete and true limit may reach further west.

    Quoted from page 2
    Graywacke considers the probability of further sinkholes over the operating life of the Project to be high over the shallow workings.

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 2 · 2023-05-15

    Source consultant_memo · Claim type study_finding · Polarity presence · Confidence high · Quote check exact, 100 of 100

  11. C-6a69538071

    Excluding the undermined area removes about 165 of 240 fenced East Block acres, roughly 20 to 25 MW of capacity.

    Quoted from page 3
    about 165 acres of the 240 fenced acres in the East Block, or roughly 20 to 25 MW of the Project's capacity

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 3 · 2023-05-15

    Source consultant_memo · Claim type recommendation · Polarity neutral · Confidence high · Quote check exact, 100 of 100

    Filed under EN-02, PE-04

  12. C-9dcc852809

    No severed mineral estate other than coal (Parcel 9) and oil and gas (Parcels 2 and 5) was found.

    Quoted from page 3
    No mineral estate other than coal (Parcel 9) and oil and gas (Parcels 2 and 5) was found severed.

    Commitment for Title Insurance No. ATA-23-0418 (Parcels 2, 5 and 9) · DR-0006 · Page 3 · 2023-04-18

    Source public_record · Claim type absence · Polarity absence · Confidence high · Quote check exact, 100 of 100

    Cited by PE-05 · Filed under EN-02, PE-05

  13. C-a3cebd779c

    Two plugged and abandoned oil and gas wells are within the project area, and an active horizontal Utica well pad adjoins it.

    Quoted from page 1
    two plugged and abandoned oil and gas wells within the project area and an active horizontal Utica well pad adjoining it.

    ODNR Environmental Review - Tamsin Ridge Solar and Storage Project (ODNR 23-0477) · DR-0011 · Page 1 · 2023-05-02

    Source agency_determination · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by EN-01 · Filed under EN-01, EN-02

  14. C-caad69ed74

    Mine subsidence is possible over abandoned underground workings.

    Quoted from page 1
    Mine subsidence is possible over abandoned underground workings.

    ODNR Environmental Review - Tamsin Ridge Solar and Storage Project (ODNR 23-0477) · DR-0011 · Page 1 · 2023-05-02

    Source agency_determination · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

  15. C-d106c90db2

    ODNR maps show the abandoned Elsby No. 2 underground coal mine beneath approximately 165 acres of the East Block (Parcels 9, 10 and 12).

    Quoted from page 1
    beneath approximately 165 acres of the East Block (Parcels 9, 10 and 12)

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 1 · 2023-05-15

    Source consultant_memo · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by EG-01 · Filed under EG-01, EN-02

  16. C-d9db0a1832

    Records show abandoned underground Elsby No. 2 Mine beneath the eastern part of the project area, plus pre-1977 reclaimed surface mining.

    Quoted from page 1
    Division records show abandoned underground coal mining, the Elsby No. 2 Mine in the Upper Freeport (No. 7) coal, beneath the eastern part of the project area

    ODNR Environmental Review - Tamsin Ridge Solar and Storage Project (ODNR 23-0477) · DR-0011 · Page 1 · 2023-05-02

    Source agency_determination · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by EN-01 · Filed under EN-01, EN-02

  17. C-e538cf508c

    Borings B-17 and B-19 dropped through voids and collapsed rubble at 61 and 74 feet.

    Quoted from page 1
    Borings B-17 and B-19 dropped through voids and collapsed rubble at 61 and 74 feet.

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 1 · 2023-05-15

    Source field_study · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

  18. C-e98a4f0f1c

    Two closed depressions on Parcel 10 are mine subsidence features (sinkholes).

    Quoted from page 1
    Two closed depressions, 12 and 20 feet across, on Parcel 10 are mine subsidence features (sinkholes).

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 1 · 2023-05-15

    Source field_study · Claim type presence · Polarity presence · Confidence medium · Quote check exact, 100 of 100

  19. C-eaec90390e

    A geotechnical report must address an abandoned underground mine in the East Block.

    Quoted from page 1
    A geotechnical report addressing the abandoned underground mine in the East Block.

    OPSB Pre-Application Conference Summary - Tamsin Ridge Solar and Storage Project · DR-0026 · Page 1 · 2023-03-28

    Source agency_determination · Claim type presence · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Filed under EN-01, EN-02

  20. C-f29a379025

    The substation, BESS yard and inverters must not be built over the undermined area.

    Quoted from page 2
    The substation, the BESS yard and the inverters must not be built over the undermined area.

    Preliminary Geotechnical Engineering Report - Tamsin Ridge Solar and Storage Project · DR-0018 · Page 2 · 2023-05-15

    Source consultant_memo · Claim type constraint · Polarity presence · Confidence high · Quote check exact, 100 of 100

    Cited by EG-04 · Filed under EG-04, EN-02

  21. C-fd52f76b29

    Blasting is not expected.

    Quoted from page 3
    Blasting is not expected;

    Noise Assessment - Tamsin Ridge Solar and Storage Project · DR-0016 · Page 3 · 2023-07-10

    Source consultant_memo · Claim type absence · Polarity absence · Confidence high · Quote check exact, 100 of 100

    Cited by CO-03 · Filed under CO-03, EN-02

3Permits and requirements

The requirements tied to the rows of this report, by level. Each quote from dated law is shown with its source, the version in force on the cut-off and the basis for it.

No requirement is tied to the rows of this report.

4What is missing

The information requests the run raised for the rows of this report, by priority: what is missing, what follows from it, and whether it holds up the decision.

Medium priority (1)

  • IR-66c5dc2424 · Medium priority

    Provide the karst, mine or oil and gas well mapping for the project area, or confirm none exists.

    Missing evidence
    Karst, mine or oil and gas well mapping
    Consequence
    Geotechnical and Soils is rated on partial evidence without it.
    Blocks the decision
    No
    Raised by
    completeness

5Next steps and agencies

Next steps

  • Keep the undermined area out of the layout, with no substation, BESS or inverters over it; commission a mine-void investigation to confirm its limits.
  • Survey, fence and set back plugged wells; coordinate pad setbacks with the operator and ODNR.
  • Compare grouting cost against capacity loss.

Agencies

  • ODNR
  • OPSB

6Basis and limits

This report is a desk review of the documents quoted above, as the engine read them for an information cut-off of 2023-08-01.

It is not a field survey and not a modelled study: this review made no site visit and ran no acoustic, hydraulic or other model. Where the record is silent, the report says what is missing; it does not fill the gap.

Every statement, figure and quote is the engine's record as written. The headings and connecting words are fixed text of this room, the same in every report.

Versions and data hashes

As the engine and the exporter recorded them. Hashes are SHA-256.

Information cut-off
2023-08-01
Engine version
2.11.0
Prompt version
2026-11-08.1
Rows pack
rows.json sha256 a018ecd7e4703bc1
Federal pack
federal.json sha256 8841c555ff35d20b
State pack
oh.json sha256 d4780705e1f18d09
Local pack
oh_carroll_county.json sha256 905cd3308848e7e8
Data room manifest
0c7e80d0ad17d1e3ed4060b9702e5b1905060ae2896e9aad796a57b590005832
Audit chain
valid (19 events)
QA status
PASS_WITH_WARNINGS
Rendered at
2026-11-10T15:42:40+00:00
Run record (annex)
66fca2c4c0bfa90df1e8efb79c0d2f426536b41f50a6a9b6869dd85e4554fd50
Exporter
Prism/room/exporter 1.4.0

Prism desk report · engine 2.11.0 · prompts 2026-11-08.1 · information cut-off 2023-08-01

Lumerian Labs 2026